Operations Day -- 32/1999 (1 Feb 99)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 032/1999 (Feb 1, 1999)
	Mission Day -- 527
	Orbit Number -- 99032

	Pass Highlights:  station:  DSS-27      AOS: 15:21       LOS: 18:55


	Pass Summary: Recorder replay. Redumped slices 166-168.

	Anomalies: NONE

	Activities:
15:25:00	BOT
15:31:04	SSR-B  placed in RECORD Operate Mode
15:31:51	SSR-A  placed in PLAYBACK Operate Mode
15:33:18	Time Tag bins loaded for LOS
16:02:03	S/C commanded to SCIENCE Downlink Format
18:14:54	SSR  playback completed
18:30:35	S/C commanded to ADC Downlink Format
18:31:00	Poke commands issued to Active and Inactive C&DH
18:34:13	Time Tag bins loaded for next day AOS time
18:55:00	EOT

BACK
Operations Day -- 33/1999 (2 Feb 99)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 033/1999 (Feb 2, 1999)
	Mission Day -- 527
	Orbit Number -- 99033

	Pass Highlights:  Station      AOS: 13:28         LOS: 16:50
	                  DSS-66

	Pass Summary: Successful Attitude Maneuver performed. Recorder dump
with a replay of slices 311-350 due to a packet extractor crash. ULEIS
OCR-014 was executed to maintain the gain on the Micro Channel Plates.

	Anomalies: AOS delayed by 8 minutes due to TGC problem at station
(see anomaly report #G99-0012) DR#L02963. No impact on data recovery.
Packet extractor crashed at 14:55 necessitating a recycle of TPOCC (see
anomaly report G99-0013). All slices recovered.

	Activities:
13:20:00	BOT
13:32:34	SSR-A  placed in RECORD Operate Mode
13:33:23	SSR-B  placed in PLAYBACK Operate Mode
13:34:39	Time Tag bins loaded for LOS
13:36:55	Catbeds Powered ON
15:30:25	Maneuver Started
15:37:09	Maneuver Completed
15:47:46	Dump Complete
15:53:27	Catbeds Powered OFF
16:20:15	S/C commanded to SCIENCE Downlink Format
16:41:31	S/C commanded to ADC Downlink Format
16:42:00	Poke commands issued to Active and Inactive C&DH
16:44:22	Time Tag bins loaded for next day AOS time
16:50:00	EOT

BACK
Operations Day -- 34/1999 (3 Feb 99)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 034/1999 (February 3, 1999)
	Mission Day -- 528
	Orbit Number -- 99034

	Pass Highlights:  station:  DSS-61      AOS: 13:20      LOS: 16:50


	Pass Summary: Nominal recorder dump

	Anomalies: NONE

	Activities:
13:20:00	BOT
13:24:56	SSR-B  placed in RECORD Operate Mode
13:25:43	SSR-A  placed in PLAYBACK Operate Mode
13:26:55	Time Tag bins loaded for LOS
13:32:36	S/C commanded to SCIENCE Downlink Format
15:51:00	SSR  playback completed
16:24:43	S/C commanded to ADC Downlink Format
16:25:00	Poke commands issued to Active and Inactive C&DH
16:28:02	Time Tag bins loaded for next day AOS time
16:50:00	EOT

BACK
Operations Day -- 35/1999 (4 Feb 99)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 035/1999 (Feb 4, 1999)
	Mission Day -- 529
	Orbit Number -- 99035

	Pass Highlights:  station:  DSS-66      AOS: 13:22         LOS:
16:55

	Pass Summary: Nominal recorder replay

	Anomalies: NONE

	Activities:
13:25:00	BOT
13:29:08	SSR-A  placed in RECORD Operate Mode
13:29:53	SSR-B  placed in PLAYBACK Operate Mode
13:31:18	Time Tag bins loaded for LOS
13:37:46	S/C commanded to SCIENCE Downlink Format
16:09:24	S/C commanded to ADC Downlink Format
16:28:00	Poke commands issued to Active and Inactive C&DH
16:31:15	Time Tag bins loaded for next day AOS time
16:55:00	EOT

BACK
Operations Day -- 36/1999 (5 Feb 99)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 036/1999 (Feb 5, 1999)
	Mission Day -- 530
	Orbit Number -- 99036

	Pass Highlights:  station:  DSS-66   AOS: 12:47   LOS: 16:20


	Pass Summary: Recorder dump. Replayed slices 231-233

	Anomalies: NONE

	Activities:
12:50:00	BOT
12:54:00	SSR-B  placed in RECORD Operate Mode
12:55:46	SSR-A  placed in PLAYBACK Operate Mode
12:56:08	Time Tag bins loaded for LOS
13:00:50	S/C commanded to SCIENCE Downlink Format
15:18:40	SSR  playback completed
15:54:50	S/C commanded to ADC Downlink Format
15:55:00	Poke commands issued to Active and Inactive C&DH
15:58:16	Time Tag bins loaded for next day AOS time
16:20:00	EOT

BACK
Operations Day -- 37/1999 (6 Feb 99)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 037/1999 (Feb 6, 1999)
	Mission Day -- 531
	Orbit Number -- 99037

	Support Team: Tony Afkhami - SC, Paul Douglas - SA, Brian Pickrell

	Pass Highlights:  station:  DSS-61   AOS: 13:16   LOS: 16:50


	Pass Summary: Recorder dump with replay of slices 304-306. Weekly
SWEPAM calibrations performed.

	Anomalies: NONE

	Activities:
13:20:00	BOT
13:24:21	SSR-A  placed in RECORD Operate Mode
13:25:09	SSR-B  placed in PLAYBACK Operate Mode
13:26:20	Time Tag bins loaded for LOS
13:36:10	S/C commanded to SCIENCE Downlink Format
13:39:00	SWEPAM calibrations performed
15:55:06	SSR-B  playback completed
16:26:02	S/C commanded to ADC Downlink Format
16:27:00	Poke commands issued to Active and Inactive C&DH
16:29:00	Time Tag bins loaded for next day AOS time
16:50:00	EOT

BACK
Operations Day -- 38/1999 (7 Feb 99)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 038/1999 (Feb 7, 1999)
	Mission Day -- 532
	Orbit Number -- 99038

	Pass 1 Highlights:  station:  DSS-54      AOS: 12:55       LOS: 14:15
	Pass 2 Highlights:  station:  DSS-16      AOS: 15:15       LOS:
18:50

	Two-Pass Summary: Tested station 54 (Madrid 34m Beam Wave Guide).
Began replay of SSR-A from that station. Successful command capability and
telemetry and 5-16 monitor block receipt. Completed replay of SSR-A on
station 16.

	Anomalies: NONE for either station

	Activities:
13:00:00	BOT w/ DSS-54
13:04:50	SSR-B  placed in RECORD Operate Mode
13:05:36	SSR-A  placed in PLAYBACK Operate Mode
13:07:05	Time Tag bins loaded for LOS
13:18:07	S/C commanded to SCIENCE Downlink Format
13:51:30	SSR-A  commanded to "idle"
13:56:25	S/C commanded to ADC Downlink Format
13:57:00	Poke commands issued to Active and Inactive C&DH
14:00:16	Time Tag bins loaded for next day AOS time
14:15:00	EOT w/ DSS-54
15:20:00	BOT w/ DSS-16
15:24:43	SSR-A PLAYBACK restarted from point where DSS-54 pass left off
15:26:56	Time Tag bins loaded for LOS
15:38:26	S/C commanded to SCIENCE Downlink Format
17:05:06	SSR-A  playback complete
18:30:33	S/C commanded to ADC Downlink Format
18:31:00	Poke commands issued to Active and Inactive C&DH
18:34:06	Time Tag bins loaded for next day AOS time
18:50:00	EOT w/ DSS-16

	Test results for station 54: Telemetry data quality and command
capability all nominal. Analysis of ranging data TBD.


BACK
Operations Day -- 39/1999 (8 Feb 99)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 039/1999 (Feb 8, 1999)
	Mission Day -- 533
	Orbit Number -- 99039

	Pass Highlights:  station:  DSS-61   AOS= 13:40:14   LOS = 17:15:00


	Pass Summary:
	Nominal Support with playback of SSR B

	Anomalies:NONE.

  	Activities:
13:45:00	BOT w/ DSS 61
13:51:44	SSR A placed in RECORD Operate Mode
13:52:34	SSR B placed in PLAYBACK Operate Mode
13:53:39	Time Tag bins loaded for LOS
14:31:31	S/C commanded to SCIENCE Downlink Format
16:25:51	SSR B playback completed
16:38:03	S/C commanded to ADC Downlink Format
16:39:00	Poke commands issued to Active and Inactive C&DH
16:41:32	Time Tag bins loaded for next day AOS time
17:15:00	EOT w/ DSS 61

BACK
Operations Day -- 40/1999 (9 Feb 99)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 040/1999 (February 9, 1999)
	Mission Day -- 534
	Orbit Number -- 99040

	Pass Highlights:  station:  DSS-16   AOS = 19:37:48   LOS =
23:10:00

	Pass Summary:
	During Support Workstation 1 in MOR which is used for DPS Product
Generation for ASC crashed.  The Data from the support will be replayed
from History/CDR files for Product generation.

	Anomalies:
	G99-0014 -  AC1WS1 crashed resulting in inability to process data
for ASC

	Activities:
19:40:00	BOT w/ DSS 16
19:42:06	SSR A placed in RECORD Operate Mode
19:42:53	SSR  placed in PLAYBACK Operate Mode
19:44:22	Time Tag bins loaded for LOS
20:09:40	S/C commanded to SCIENCE Downlink Format
22:57:38	SSR  playback completed
23:04:04	S/C commanded to ADC Downlink Format
23:04:31	Poke commands issued to Active and Inactive C&DH
23:06:00	Time Tag bins loaded for next day AOS time
23:10:00	EOT w/ DSS

BACK
Operations Day -- 41/1999 (10 Feb 99)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 041/1999 (February 10, 1999)
	Mission Day -- 535
	Orbit Number -- 99041

	Pass Highlights:  station:  DSS-61   AOS = 14:11:52   LOS =
17:15:00

	Pass Summary:
	Nominal Support with SSR B playback

	Anomalies:
	None.

	Activities:
14:15:00	BOT w/ DSS 61
14:23:01	SSR A placed in RECORD Operate Mode
14:23:50	SSR B placed in PLAYBACK Operate Mode
14:25:07	Time Tag bins loaded for LOS
16:20:36	S/C commanded to SCIENCE Downlink Format
16:26:52	SSR  playback completed
16:57:55	S/C commanded to ADC Downlink Format
16:58:00	Poke commands issued to Active and Inactive C&DH
17:01:11	Time Tag bins loaded for next day AOS time
17:15:00	EOT w/ DSS 61

BACK
Operations Day -- 42/1999 (11 Feb 99)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 042/1999 (February 11, 1999)
	Mission Day -- 536
	Orbit Number -- 99042

	Pass Highlights:  station:  DSS-66   AOS = 13:16:12   LOS =
16:50:00

	Pass Summary:
	Executed S/C operation to change Selectable Telm byte for
verification of YM_HINGEBLNKT telemetry point.  SSR playback of SSR A
completed successfully

	Anomalies:
	None.

	Activities:
13:20:00	BOT w/ DSS 66
13:20:56	SSR B placed in RECORD Operate Mode
13:21:47	SSR A  placed in PLAYBACK Operate Mode
13:23:37	Time Tag bins loaded for LOS
13:44:03	S/C commanded to SCIENCE Downlink Format
14:02:55	Change select tlm byte on active side for DCM2_PT16 offset
of 2095
14:04:42	Change select tlm byte on active side back to nominal
offset of 2089 for Hot fill drn vlt t
15:43:16	SSR  playback completed
16:22:27	S/C commanded to ADC Downlink Format
16:23:00	Poke commands issued to Active and Inactive C&DH
16:25:39	Time Tag bins loaded for next day AOS time
16:50:00	EOT w/ DSS 66

BACK
Operations Day -- 43/1999 (12 Feb 99)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 043/1999 (February 11, 1999)
	Mission Day -- 537
	Orbit Number -- 99043

	Pass Highlights:  Station      AOS            LOS
	                  DSS-66      13:45:22      17:00:00


	Pass Summary:
	 ACE R/T support was executed in G.A.S facility for first time
using Y2k S/W.  Successful attitutude maneuver was completed (31 pulse
maneuver ) .   Experienced some minor problems executing support from G.A.S
none of which resulted in inability to cmd.
	    - FORMATS tables were not setup correctly causing inability to
process maneuver from G.A.S. facility. Maneuver command sheet was
transferred from MAR to GAS. The new version of FORMATS was setup correctly
later and tested.
	    - DPS configuration needs to be modified for same configuration
as MOR
	    - Offline scripts and procedures need to be tweaked for
operations in GAS
	    -  GRI needs to be updated

	Anomalies:
	None.

	Activities:
13:50:00	BOT  w/ DSS 66
13:55:11	SSR A  placed in RECORD Operate Mode
13:55:54	SSR B placed in PLAYBACK Operate Mode
13:57:26	Time Tag bins loaded for LOS
14:01:33	Catbeds Powered ON for Attitude Maneuver
16:15:29	Attitude Maneuver Started
16:21:38	Maneuver Completed
16:26:14	Catbeds Powered OFF
16:36:51	S/C commanded to SCIENCE Downlink Format
16:31:31	Weekly SWEPAM calibrations performed
16:31:55	SSR B playback completed
16:50:11	S/C commanded to ADC Downlink Format
16:50:41	Poke commands issued to Active and Inactive C&DH
16:53:28	Time Tag bins loaded for next day AOS time
17:00:00	EOT w/ DSS 66

BACK
Operations Day -- 44/1999 (13 Feb 99)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 044/1999 (February 13, 1999)
	Mission Day -- 538
	Orbit Number -- 99044

	Pass Highlights:  station:  DSS-61   AOS = 13:35:40   LOS =17:10:00


	Pass Summary:
	Day 2 of R/T operations from G.A.S nominal.  Received several
Autonomy and Timtag bin dump miscompares due to GRI not being updated in
G.A.S facility. Dumps were compared manually with GRI from MOR.  MOR used
for DPS data capture and Hot B/U.  All deliverable products delivered
successfully.

	Anomalies:
	None.

	Activities:
13:40:00	BOT w/ DSS 61
13:44:19	SSR B placed in RECORD Operate Mode
13:45:01	SSR A placed in PLAYBACK Operate Mode
13:46:40	Time Tag bins loaded for LOS
14:10:36	ADS Program Run from G.A.S only for FDF
14:22:43	S/C commanded to SCIENCE Downlink Format
16:13:22	SSR A playback completed
16:48:19	S/C commanded to ADC Downlink Format
16:48:38	Poke commands issued to Active and Inactive C&DH
16:51:14	Time Tag bins loaded for next day AOS time
17:10:00	EOT w/ DSS

BACK
Operations Day -- 45/1999 (14 Feb 99)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 045/1999 (February 14, 1999)
	Mission Day -- 539
	Orbit Number -- 99045

	Pass Highlights:  station:  DSS-16   AOS = 14:53:59   LOS -18:10:00


	Pass Summary:
	R/T operations continue from G.A.S -   Scheduled DSS 61 support for
day was taken by SOHO for declared S/C emergency.   Secured support from
DSS-16 - All ops nominal with playback of SSR B data  completed.   Minor
GAS configuration issues encountered.
	Due to the change in Support time S/C configured to ADC format via
time tag bin for 1 hour before second time tag configured back to RTSW.
NOAA and AFSCN where notified of changes to R/T support schedule.  13:45z
was original AOS time.

	Anomalies:
	None.

	Activities:
15:00:00	BOT w/ DSS 16
14:43:59	AOS RTSW format
15:05:04	Acquired ADC format
15:06:39	SSR  A placed in RECORD Operate Mode
15:07:47	SSR  B placed in PLAYBACK Operate Mode
15:09:24	Time Tag bins loaded for LOS time of 18:30 z
15:12:19	ADS program run for FDF
15:30:27	S/C commanded to SCIENCE Downlink Format
17:46:23	SSR B playback completed
17:53:39	S/C commanded to ADC Downlink Format
17:53:57	Poke commands issued to Active and Inactive C&DH
17:56:53	Time Tag bins loaded for next day AOS time
17:59:31	Time Tag bins re-loaded for LOS time of 18:10 z
18:10:00	EOT w/ DSS 16

BACK
Operations Day -- 46/1999 (15 Feb 99)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 046/1999 (February 15, 1999)
	Mission Day -- 540
	Orbit Number -- 99046

	Pass Highlights:  station:  DSS-16   AOS = 16:30:44   LOS -18:10:00
Primary string=MOR

	Pass Summary: Scheduled support changed to emergency support of
SOHO spacecraft.  The previous pass set up  the S/C to automatically switch
data rates (low to high) at 1305 (original BOT-5min).
	Since no contact was made, s/c automatically switched back to RTSW
format at 1410. No time tag bin was loaded for format change at AOS
tomorrow due to the possibility of more schedule changes.

	Anomalies:
	DR #N50160 (1-1/2 hour dropout of voice communications with DSS-16)

	Activities:
13:05:00	Spacecraft switched to ADC format
14:10:00	Spacecraft switched to RTSW format
16:30:00	BOT w/ DSS 16
16:35:40	Commanded spacecraft to  ADC format
16:37:49	SSR  B placed in RECORD Operate Mode
16:38:37	SSR  A placed in PLAYBACK Operate Mode
16:40:01	Time Tag bins loaded for LOS time of 18:30 z
16:58:30	ADS program run for FDF
17:11:15	S/C commanded to SCIENCE Downlink Format
19:14:10	SSR B playback completed
19:45:13	S/C commanded to ADC Downlink Format
19:44:47	Poke commands issued to Active and Inactive C&DH
18:00:00	EOT w/ DSS 16

BACK
Operations Day -- 47/1999 (16 Feb 99)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 047/1999 (February 16, 1999)
	Mission Day -- 541
	Orbit Number -- 99047

	Pass Highlights:  station:  DSS-16    AOS = 14:54:03 -15:04:32 RTSW
, AOS 16:00 HRate ADC     LOS -19:00:00

	Pass Summary: Late DSN schedule changes due to priority requests
from SOHO. Due to the possibility of more changes, the AOS time tag bin was
NOT loaded during the previous pass. The procedure g_initial_contact sent
the commands to switch data rates.
	There was a one hour delay in transitioning from RTSW to High rate
ADC format.  Preliminary analysis indicates that a command to set the
Telemetry Mod Index to high did not reach the S/C or execute. Cmd
verification is disabled when this command is sent.
	Subsequent commands put the Frame Sequence Number (FSN) out of sync
with the S/C report value.  A transition to the MOR was performed,
suspecting that the GAS facility could be the problem.
	This move was premature and the GAS facility is believed to not
have been a factor in the problem.  After sending several D/L format/resync
cmds to the S/C the D/L changed from 498 bps to 87,648 bps.  Pass extended
1/2 hr. Problem is under investigation.
	All pass activities were completed.

	Anomalies:  AR G99-0015     Command did not get to S/C.

	Activities:
14:54:03	AOS RTSW format
15:00:00	BOT w/ DSS 16
15:04:57	S/C did NOT switch to High Rate ADC as expected - cmd FSN
does not match clcw report value
15:05:38	Data went static - No tlm
15:17:34	resynchs failed - killed active procedures and started
g_initial_contact again
15:23:21	resent downlink format commands.
15:27:48	Disabled inif command capability and began failover to MOR
15:31:56	resent downlink format commands from MOR.
15:47:23	Sent downlink format command for low rate ADC.
15:57:10	Sent downlink format command for medium rate science.
15:59:06	Mysteriously began receiving high rate ADC data. Still
under investigation.
16:20:32	SSR  A placed in RECORD Operate Mode
16:21:38	SSR  B placed in PLAYBACK Operate Mode
16:34:41	Time Tag bins loaded for LOS time of 19:00 z (pass extended
from 1830 to 1900)
16:40:25	S/C commanded to SCIENCE Downlink Format then R/T ops
transition to GAS facility
17:07:13	Executed OCR SWPX_009
18:47:00	SSR A playback completed
18:46:16	S/C commanded to ADC Downlink Format
18:47:21	Poke commands issued to Active and Inactive C&DH
18:49:58	Time Tag bins loaded for next day AOS time
19:00:00	EOT w/ DSS 16

BACK
Operations Day -- 48/1999 (17 Feb 99)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 048/1999 (February 17, 1999)
	Mission Day -- 540
	Orbit Number -- 99048

	Pass Highlights:  station:  DSS-16   AOS  15:05     LOS  18:40


	Pass Summary: Nominal pass with recorder dump.  ACE FOT ran pass in
parallel from MOR and GAS facilities

	Anomalies:
	AC3WS2 ran out of memory when hosting TPOCC mission - no AR written

	Activities:
15:10:00	BOT w/ DSS16
15:19:08	SSR B placed in RECORD Operate Mode
15:19:50	SSR A placed in PLAYBACK Operate Mode
15:21:03	Time Tag bins loaded for LOS
15:55:05	S/C commanded to SCIENCE Downlink Format
17:44:00	SSR  playback completed
18:29:12	S/C commanded to ADC Downlink Format
18:30:00	Poke commands issued to Active and Inactive C&DH
18:32:56	Time Tag bins loaded for next day AOS time
18:40:00	EOT w/ DSS16

BACK
Operations Day -- 49/1999 (18 Feb 99)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 049/1999 (February 18, 1999)
	Mission Day -- 543
	Orbit Number -- 99049

	Pass Highlights:  station:  DSS-16     AOS  16:25     LOS  20:00


	Pass Summary: Nominal

	Anomalies:None

	Activities:
16:30:00	BOT w/ DSS
16:38:10	SSR  placed in RECORD Operate Mode
16:37:25	SSR  placed in PLAYBACK Operate Mode
16:39:43	Time Tag bins loaded for LOS
17:02:44	S/C commanded to SCIENCE Downlink Format
19:14:00	SSR  playback completed
19:46:00	S/C commanded to ADC Downlink Format
19:46:44	Poke commands issued to Active and Inactive C&DH
19:48:58	Time Tag bins loaded for next day AOS time
20:00:00	EOT w/ DSS



	NOTE:  Pass supported from the MOR, no GAS support today.

BACK
Operations Day -- 50/1999 (19 Feb 99)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 050/1999 (February 19, 1999)
	Mission Day -- 544
	Orbit Number -- 99050

	Pass Highlights:  station:  DSS-16     AOS  14:49     LOS  18:20


	Pass Summary: Nominal however, there was a packet extractor crash
at 15:34z, 8 min. of SSRA recorder data had to be replayed.  All data was
recovered.

	Anomalies: AR # G99-0016

	Activities:
14:50:00	BOT w/ DSS
14:56:00	SSR  placed in RECORD Operate Mode
14:56:48	SSR  placed in PLAYBACK Operate Mode
14:58:12	Time Tag bins loaded for LOS
15:13:29	S/C commanded to SCIENCE Downlink Format
17:14:00	SSR  playback completed
18:03:19	S/C commanded to ADC Downlink Format
18:00:07	Poke commands issued to Active and Inactive C&DH
18:06:55	Time Tag bins loaded for next day AOS time
18:20:00	EOT w/ DSS


	Note:  The GAS/DTF-21 I/F test was being run in parallel  with  the
R/T ACE pass - at 16:08 a burst of simulator data was received on the MOR
realtime string of equipment.  SFG configured incorrectly, the problem was
corrected and there was no impact to realtime support. Offline processing
required 3.5 hours additional support to replay data to weed out invalid
test data.

BACK
Operations Day -- 51/1999 (20 Feb 99)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 051/1999 (February 20, 1999)
	Mission Day -- 545
	Orbit Number -- 99051

	Pass Highlights:  station:  DSS-66     AOS  1321     LOS  1655


	Pass Summary:  Routine pass with recorder dump.  ACE FOT operated
in MOR/MAR since GAS was not able to support the pass after recent hardware
reconfiguration (Oracle database not up - No AR written).

	Anomalies:  None

	Activities:
13:25:00	BOT w/ DSS66
13:33:09	SSR A placed in RECORD Operate Mode
13:33:56	SSR B placed in PLAYBACK Operate Mode
13:35:21	Time Tag bins loaded for LOS
13:51:25	S/C commanded to SCIENCE Downlink Format
16:02:49	SSR  playback completed
16:38:57	S/C commanded to ADC Downlink Format
16:40:26	Poke commands issued to Active and Inactive C&DH
16:43:12	Time Tag bins loaded for next day AOS time
16:55:00	EOT w/ DSS66

BACK
Operations Day -- 52/1999 (21 Feb 99)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 052/1999 (February 21, 1999)
	Mission Day -- 546
	Orbit Number -- 99052

	Pass Highlights:  station:  DSS-66     AOS  14:45:53     LOS  16:00


	Pass Summary: Nominal Support

	Anomalies:None

	Activities:
12:40:00	BOT w/ DSS
12:54:21	SSR  placed in RECORD Operate Mode
12:55:12	SSR  placed in PLAYBACK Operate Mode
12:56:37	Time Tag bins loaded for LOS
13:09:16	S/C commanded to SCIENCE Downlink Format
15:13:00	SSR  playback completed
15:45:13	S/C commanded to ADC Downlink Format
15:45:59	Poke commands issued to Active and Inactive C&DH
15:49:15	Time Tag bins loaded for next day AOS time
16:00:00	EOT w/ DSS

BACK
Operations Day -- 53/1999 (22 Feb 99)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 053/1999 (February 22, 1999)
	Mission Day -- 547
	Orbit Number -- 99053

	Pass Highlights:  station:  DSS-66   AOS = 13:59:37   LOS =17:00:00


	Pass Summary:
	R/T ops run from GAS Facility.  Unable to run DPS during R/T
support due to ORACLE DB problems associated with reboot of Workstation 1.
ORACLE developers instituted fix post-pass.

	Anomalies:

	Activities:
13:50:00	BOT w/ DSS 66
14:04:05	SSR A placed in RECORD Operate Mode
14:04:49	SSR B placed in PLAYBACK Operate Mode
14:06:11	Time Tag bins loaded for LOS
14:45:06	S/C commanded to SCIENCE Downlink Format
16:34:32	S/C commanded to ADC Downlink Format
16:35:56	Poke commands issued to Active and Inactive C&DH
16:39:12	Time Tag bins loaded for next day AOS time
17:00:00	EOT w/ DSS 66

BACK
Operations Day -- 54/1999 (23 Feb 99)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 054/1999 (February 23, 1999)
	Mission Day -- 549
	Orbit Number -- 99054

	Pass Highlights:  station:  DSS-27   AOS = 14:40:40   LOS =
18:15:00

	Pass Summary:
	Received duplicate telemetry frames from DSS 27.  Duplicate frames
from GAS caused flooding of event page with related event messages prior to
SSR playback.  Problem was resolved with DSS 27 and all operations were
nominal.

	Anomalies: None.

	Activities:
14:45:00	BOT w/ DSS 27
15:01:59	Replayed slices from previous day SSR B for DPS capture
purposes
15:12:43	SSR B placed in RECORD Operate Mode
15:13:53	SSR A placed in PLAYBACK Operate Mode
15:15:13	Time Tag bins loaded for LOS
15:26:58	S/C commanded to SCIENCE Downlink Format
17:48:27	SSR  playback completed
17:56:02	S/C commanded to ADC Downlink Format
17:56:26	Poke commands issued to Active and Inactive C&DH
17:58:49	Time Tag bins loaded for next day AOS time
18:15:00	EOT w/ DSS 27

BACK
Operations Day -- 55/1999 (24 Feb 99)
	Operations Day -- 055/1999 (February 24, 1999)
	Mission Day -- 549
	Orbit Number -- 99055

	Pass Highlights:  Station   AOS = 13:47:48   LOS = 17:00:00
	                  DSS-66

	Pass Summary:
	 - Executed nominal attitude maneuver of 36 pulses (Sun Angle =
6.45  HGA = 4.35)
	 - Performed GRI overlay update for G.A.S facility for S/C autonomy
and Timetag dump compares.

	Anomalies: None.

	Activities:
13:45:00	BOT  w/ DSS 66
13:53:42	SSR A placed in RECORD Operate Mode
13:54:26	SSR B  placed in PLAYBACK Operate Mode
13:55:50	Time Tag bins loaded for LOS
13:57:49	Radial Catbeds Powered ON for Attitude Maneuver
15:18:31	Maneuver Started
15:25:37	Maneuver Completed
15:38:18	Radial Catbeds Powered OFF
15:56:33	S/C commanded to SCIENCE Downlink Format
16:35:55	S/C commanded to ADC Downlink Format
16:37:08	Poke commands issued to Active and Inactive C&DH
16:40:49	Time Tag bins loaded for next day AOS time
16:45:00	Performed GRI overlay  for Autonomy and Time Tag for GAS
16:47:46	Perfomed Autonomy and Timetag dump image compare
17:00:00	EOT w/ DSS 66

BACK
Operations Day -- 56/1999 (25 Feb 99)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 056/1999 (February 25, 1999)
	Mission Day -- 550
	Orbit Number -- 99056

	Pass Highlights:  station:  DSS-66   AOS = 12:35:14   LOS =
16:10:00

	Pass Summary:
	Voice line (Scama 272) between GSFC and JPL was down during early
part of support.  Voice control connected ACE B/U scama to JPL for
communications.  All other R/T activities nominal

	Anomalies: None.

	Activities:
12:40:00	BOT w/ DSS 66
12:41:51	SSR B placed in RECORD Operate Mode
12:42:34	SSR A placed in PLAYBACK Operate Mode
12:44:19	Time Tag bins loaded for LOS
13:15:46	S/C commanded to SCIENCE Downlink Format
15:04:45	SSR  playback completed
15:41:19	S/C commanded to ADC Downlink Format
15:42:24	Poke commands issued to Active and Inactive C&DH
15:45:06	Time Tag bins loaded for next day AOS time
16:10:00	EOT w/ DSS 66

BACK
Operations Day -- 57/1999 (26 Feb 99)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 057/1999 (February 26, 1999)
	Mission Day -- 551
	Orbit Number -- 99057

	Pass Highlights:  station:  DSS-66      AOS                   LOS

						134438             165500

	Pass Summary:
	Delayed AOS due to TGC problems at the site.  Following TGC swap,
there were no further anomalies.
	OCR SWPX-010 executed to perform Calibrations of SWEPAM-E
instrument.  Weekly calibration of SWEPAM-I also performed.

	Anomalies:
	G99-0017 - DR# L03053 - TGC swap resulted in delayed AOS

	Activities:
13:35:00	BOT w/ DSS 66
13:50:06	SSR A placed in RECORD Operate Mode
13:50:52	SSR B placed in PLAYBACK Operate Mode
13:52:02	Time Tag bins loaded for LOS
14:15:18	S/C commanded to SCIENCE Downlink Format
15:59:36	OCR SWPX-010 completed
15:59:45	Weekly SWPI calibration performed
16:26:02	SSR  playback completed
16:31:03	S/C commanded to ADC Downlink Format
16:32:06	Poke commands issued to Active and Inactive C&DH
16:35:00	Time Tag bins loaded for next day AOS time
16:55:00	EOT w/ DSS 66

BACK
Operations Day -- 58/1999 (27 Feb 99)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 058/1999 (February 27, 1999)
	Mission Day -- 552
	Orbit Number -- 99058

	Pass Highlights:  station:  DSS-66      AOS                   LOS

		                                125631           163000

	Pass Summary:
	Nominal Pass with no anomalies.  Active C&DH Block Bin dump
performed.

	Anomalies:
	  *  None

	Activities:
13:00:00	BOT w/ DSS 66
13:03:15	SSR B placed in RECORD Operate Mode
13:03:56	SSR A placed in PLAYBACK Operate Mode
13:05:06	Time Tag bins loaded for LOS
13:12:30	ADS software terminated
13:13:30	S/C commanded to SCIENCE Downlink Format
13:55:18	Active C&DH Block Bin Dump initiated
14:33:21	Block Bin Dump Completed successfully
14:40:14	GAS' GRI overlayed with dump file
15:25:50	SSR  playback completed
16:03:50	S/C commanded to ADC Downlink Format
16:04:49	Poke commands issued to Active and Inactive C&DH
16:07:30	Time Tag bins loaded for next day AOS time
16:30:00	EOT w/ DSS 66

BACK
Operations Day -- 59/1999 (28 Feb 99)
	ACE FLIGHT OPERATIONS DAILY REPORT

	Operations Day -- 059/1999 (February 28, 1999)
	Mission Day -- 553
	Orbit Number -- 99059

	Pass Highlights:  station:  DSS-66      AOS                   LOS

                                               124105              160000

	Pass Summary:
	  Nominal Pass

	Anomalies:
	     *  None

	Activities:
12:40:00	BOT w/ DSS 66
12:49:01	SSR  placed in RECORD Operate Mode
12:49:47	SSR  placed in PLAYBACK Operate Mode
12:51:37	Time Tag bins loaded for LOS
12:59:33	ADS software terminated
13:00:08	S/C commanded to SCIENCE Downlink Format
15:14:56	SSR  playback completed
15:36:23	S/C commanded to ADC Downlink Format
15:37:24	Poke commands issued to Active and Inactive C&DH
15:39:43	Time Tag bins loaded for next day AOS time
16:00:00	EOT w/ DSS 66

BACK