ACE Weekly Report: 08-22-01 All ACE spacecraft subsystems are performing nominally. An attitude maneuver was performed on 8/17/01. The next attitude maneuver is scheduled for 08/24/01. SSR B's 30 telemetry sections were scrolled through on 08-21-01 to verify the number of SBEs and DBEs. It continues to have zero DBEs and SBEs. SSR A's 30 telemetry sections were scrolled through on 08-22-01. No DBEs or new SBEs were detected; 15 SBEs were originally detected in December 1999. The TLAN router change for string 3 is scheduled to be made on 8-23-01. Following its completion the FOT checkout of string 3 will begin. FOT testing is scheduled to take ~10 days. No anomaly reports were generated this week. ================================================ Jacqueline Maldonado Snell Honeywell Technology Solutions Incorporated (HTSI) Goddard Space Flight Center Bldg. 14 Rm W10B, Code 428.2 Greenbelt, MD 20771 Phone: (301) 286-7072 Fax: (301) 286-1729 E-mail: Jacqueline.Snell.1@gsfc.nasa.gov