ACE Weekly Report 03-13-02 All ACE spacecraft subsystems are performing nominally. Attitude maneuvers were successfully performed on 03/01/02 and 03/08/02. The next attitude maneuvers are scheduled for 03/14/02 and 03/19/02. FOT terminated the support ~40 minutes early on 03/09/02 to accommodate a JPL/TDRS request. All remaining SSR data captured during the following support. FORMATS 2001.01D1 installed on string 3 on 03/11/02. Developer and FOT testing has been completed. String 2 installation is slated for next week. Anomalies: 03/07/02 DOY 066 AR# G02-0028 Isis software went into panic during the realtime support. IP NOC was contacted and software was restarted. No telemetry received from 14:50:57-14:56:33. All affected SSR data was redumped. No further problems experienced during the support. 03/11/02 DOY 070 AR# G02-0029 Telemetry stopped flowing to MOC ~13 minutes prior to the scheduled end of track (EOT). FOT contacted Station. Station informed FOT they were investigating and that the antenna would not be back online prior to EOT. FOT released the station ~2 minutes early (DR #G100898).