ACE Weekly 01/10/02 - 01/16/03 All ACE spacecraft subsystems are performing nominally. No attitude maneuvers were performed this week. The next maneuver is scheduled for 01/24/03. ============================================================================ OCRs Executed: NONE ============================================================================ Ongoing Activities: TAPS: Trending, Analysis and Plotting System (TAPS) development continues. VC2/VC4 processing problems may have been solved, FOT is monitoring. TAPS Release 4.1 was installed on TAPS #2 on 1/15/03. Testing will continue on TAPS#2 until such time the VC2/VC4 extraction problem is resolved on TAPS #1. A meeting has been scheduled with the SGT development team to enhance their understanding of DSN 5-16 Monitor Block processing on 1/23/03 at SGT. ---------------------------------------------------------------------------- Automation (ROBOTT): Automation is now successfully printing plots automatically. String 2 testing of the offline subsystem and the first releases of the Health and Safety Monitoring (HSM) and Command & Control subsystems are scheduled for Jan 27th. ---------------------------------------------------------------------------- HGA Angle Constraint Report: Will be released soon. ============================================================================ Anomalies: DOY 03012 (1/12/2003) #G03-0004 GDS(DSS-27) Anomalous VC2 Data Received At 11:59:26, while in support with DSS-66, TPOCC started generating VC2 sequence error messages, and the total VC2 packets received started incrementing. The VC2 data did not stop flowing until 12:10:29. DSS-66 did not have telemetry online until 12:15:44. BOT for the pass was at 12:15:00. These messages occurred again from 12:44:24 to 12:46:59. Contacted DSS-66 and JPL Comm and they both reported seeing nothing abnormal. The FOT performed a telemetry delog of the block files and determined from the DDD Header that the data was coming from DSS-27. The destination ID was 92 (ACE), and the source code was 0A8A (DSS-27). The source code for DSS-66 is 3C6A. Contacted the JPL Ops Chief about the erroneous data and he issued a DR. CAUSE: On DOY 03012, DSS-27 was being used for training of a DSN employee. The training crew failed to disable the GCF (Ground Communications Facility) after locking onto the TSA (Telemetry Simulation Assembly). This caused the simulation data to be sent to the ACE MOC. IMPACT: The raw clock calibration file was corrupted due to erroneous data on DOY 03012. No clock calibration file for DOY 03012 and 03013 was generated for the ACE Science Center (ASC) for those two days. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Glen A. Miller Honeywell Technology Solutions Inc. ACE Flight Operations Team Goddard Space Flight Center Building 14, Room W10A Mail Stop 428.2 Greenbelt, MD 20771 Office: 301-286-7071 Pager: 800-425-3174 Fax: 301-286-1729 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~