ACE Weekly 09/17/04 - 09/23/04 All ACE spacecraft subsystems are performing nominally. A "Dog-Leg" attitude maneuver was successfully executed on 09/17/04. The next attitude maneuver is scheduled for 09/27/04. ============================================================================ Orbit Events: The next SEZ crossing will occur in the Nov-Dec time frame. ===================================================================== OCRs Executed: None ===================================================================== Ongoing Activities: TAPS: - Installation of TAPS release 4.3 occurred on 07/20/04. FOT testing of this release is ongoing. -- Of the 6 DRs fixed in release 4.3, all have been verified. -- Two (2) new DRs have been opened to date and additional DRs may follow based on recent findings. ---------------------------------------------------------------------------- Automation (ROBOTT): - ROBOTT v0.8.1 performing operations in "Auto" mode on String 1. -- FOT is closely monitoring its performance and noting any discrepancies. -- ROBOTT is NOT being used for maneuvers. - ROBOTT v0.9 was delivered to Strings 2 & 3 on 09/22/04. -- 13 DR fixes in this release. -- 2 DRs verified by FOT to date. ============================================================================ Extra Spacecraft Activities: The procedure S_TLM_SECTIONS was executed on 09/22/04 and SBE_CT_B had increased to 608. The Scrub Error Count (SCRUB_ERR_CT_B) remains at 0. ===================================================================== Anomalies: DOY 04262 (09/18/2004) ACE Anomaly G04-0108 - GDS 26m (DSS-16) MFR Switch DSS-16 switched from MFR1 to MFR3 at the beginning of the pass. The FOT noticed slightly degraded data before the switch. IMPACT: None. DR# G104817 DOY 04263 (09/19/2004) ACE Anomaly G04-0109 - GDS 26m (DSS-16) Antenna Problems DSS-16 reported an elevation limit problem with the antenna while attempting to go to point (BOT 15:05). DSS-27 was available and supported the FOT for the pass. DSS-16 corrected the antenna problem however the FOT chose to remain with DSS-27 for the duration of the pass. IMPACT: None. All activities were completed without extending the pass. DR# G104823. DOY 04264 (09/20/2004) ACE Anomaly G04-0110 - MOC Console - Keyboard problem AC1XT3 keyboard did not respond to operator input. TSMs notified and a new keyboard was installed. IMPACT: None. DOY 04266 (09/22/2004) ACE Anomaly S04-0011 - Increase in SSR B SBE Count While scrolling through SSR B's 30 telemetry sections, the FOT noticed that the SBE_CT_B had increased to 608. It had previously been 286. The Scrub Error Count (SCRUB_ERR_CT_B) remains at 0. IMPACT: None. FOT will continue to run procedure periodically to monitor SBE activity. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Glen A. Miller ACE Flight Operations Observatory Engineer Honeywell Technology Solutions Inc. Goddard Space Flight Center Building 14, Room W10A Mail Stop 428.2 Greenbelt, MD 20771 Office: 301-286-7071 Pager: 800-425-3174 Fax: 301-286-1729 gamiller@pop500.gsfc.nasa.gov ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~