ACE Weekly 07/08/05 - 07/14/05 All ACE spacecraft subsystems are performing nominally. ============================================================================ Orbit/Attitude: Type Attitude Date 07/11/05 DOY 192 2005 Thrusters 2R 4R+ 4R- Duration 11:23 min Start Time 13:48:37z Stop Time 14:00:00z Firing 58 pulses The next attitude maneuver is scheduled for Friday 07/22/05. ============================================================================ OCRs: None ============================================================================ Ongoing Activities: Space Link Extension (SLE) - Development continues within the TDF configuration. The next ACE JPL telecon is scheduled for 07/21/05. The DSN/Developer test with DTF-21 is scheduled for 08/04/05. ROBOTT - Version 1.0 is scheduled for String 3 installation at 1pm on Monday 07/18/2005. Version 1.0 has fixes for 4 of the 36 open DRs. ============================================================================ Extra Activities: DOY 192 (07/11/05) SSR A 30 Telemetry Sections downlinked. No new Single Bit errors (correctable) found. DOY 195 (07/14/05) SSR B 30 Telemetry Sections downlinked. No new Single Bit errors (correctable) found. ============================================================================ Anomalies: DOY 189 (07/08/05) ACE Anomaly G05-0090 VDS Keyset Failure VDS (Voice Distribution System) Keyset (E00338, B14RW10FP0993) was not functioning. Mission Director contacted to ensure VDS was not scheduled for disconnection. VDS connection was repaired by Goddard Voice. IMPACT: None. VDS was on back-up string. DOY 190 (07/09/05) ACE Anomaly G05-0091 GDS DSS-27 Antenna Pointing At BOT, problems with the ground station's Antenna Pointing was resolved at 14:31:27z. Uplink was established at 15:05:35z. DR# G105821 IMPACT: Activities delayed 70 minutes. SSR playback incomplete. Recorder data was automatically recovered during the next support with new data recovery procedures. DOY 191 (07/10/05) ACE Anomaly S05-0022 SWICS Limit Violations SSCPAM5V had 5 brief (24 second) red high limit violations from 14:46:45z to 16:35:38z. Limit is -4.5V; violations ranged to -4.334V. Jim Raines notified. IMPACT: Awaiting instructions from Jim Raines. DOY 192 (07/11/05) ACE Anomaly S05-0023 SWICS Limit Violation SSCPAM5V had 1 brief (24 second) red high limit violation at 08:00:17z. Limit is -4.5V; violations ranged to -4.451V. Jim Raines notified. IMPACT: Awaiting instructions from Jim Raines. DOY 193 (07/12/05) ACE Anomaly G05-0092 GDS DSS-16 TCP Problems At BOT, problems with the bit rate on the ground station's TCP (Telemetry Control Processor) were resolved at 14:53:03z. DR# G105827 IMPACT: Activities delayed 13 minutes. DOY 194 (07/13/05) ACE Anomaly S05-0024 SWICS Limit Violation SSCPAM5V had 1 brief (24 second) red high limit violations at 06:01:11z. Limit is -4.5V; violations ranged to -4.412V. Jim Raines notified. IMPACT: Awaiting instructions from Jim Raines. DOY 194 (07/13/05) ACE Anomaly G05-0093 ROBOTT Notification Lost in Email Problems with HTSI email servers resulted in the loss of ROBOTT Notifications. Email servers were restored after the pass was complete. IMPACT: Minimal. ROBOTT Notifications were properly received by pagers and stored in log files. DOY 194 (07/13/05) ACE Anomaly G05-0094 GDS DSS-16 CMD Mod Index At BOT, commands were not being accepted by the spacecraft. Commands were successfully accepted after the ground station reset the CMD Mod Index. DR# G105828 IMPACT: Activities delayed 12 minutes. DOY 194 (07/13/05) ACE Anomaly G05-0095 GDS DSS-16 Heat Exchanger Uplink to the spacecraft was lost from 14:46:03z to 14:53:39z and from 15:47:27z to 16:15:00z (EOT) due to ground station problems with a Transmitter Heat Exchanger. DR# G105829 IMPACT: End Of Track spacecraft state-of-health checks not were not completed. DOY 194 (07/13/05) ACE Anomaly G05-0096 ROBOTT Endless Loop The C&C component of ROBOTT entered an endless loop when the final spacecraft state-of-health procedure did not complete at End Of Track. CDSID# 21123, 21141 IMPACT: Minimal since endless loop occurred after the end of the support. C&C was terminated by the Offline component of ROBOTT at EOT+10 minutes.