ACE Weekly 08/19/05 - 08/25/05 All ACE spacecraft subsystems are performing nominally. ============================================================================ Orbit/Attitude: Type Attitude Date 08/25/05 DOY 237 2005 Thrusters 2R 4R+ 4R- Duration 9:03 min Start Time 16:01:42z Stop Time 16:10:45z Firing 46 pulses The next attitude maneuver is scheduled for Wednesday 08/31/05. The Sun-Earth-Vehicle (SEV) angle reached a minimum of ~2.35° on Friday 08/19/2005. The L1 halo orbit continues to open up resulting in larger SEV angles. The L1 halo orbit will begin to close again in 2008 with the closest crossing in 2012. Solar Exclusion Zone (SEZ) transits are not regularly reported since DSN has had no problems acquiring ACE telemetry with SEV angles greater than 1°. ============================================================================ OCRs: None ============================================================================ Ongoing Activities: Space Link Extension (SLE) - The Test Plan has been completed and signed off. Development continues within the TDF configuration. The DSN/Developer test with DTF-21 is scheduled for 09/01/05. ROBOTT - The ROBOTT Test Summary Report for Version 1.0 has been completed and signed off. Operations has transitioned to this release. ============================================================================ Extra Activities: DOY 237 (08/25/05) - During the troubleshooting of a modem protection switch at JPL (1700-2100z), there were brief gaps in telemetry. No investigation was done to determine if the gaps were due to the troubleshooting. All data was captured through redumps. DOY 237 (08/25/05) - A 1-hour (1920-2020z) support was scheduled for a Project Interface Test (PIT) of DSN's Link Monitor Processor (LMP). No problems occurred during the support. The post-pass data analysis is underway. ============================================================================ Anomalies: DOY 233 (08/21/05) ACE Anomaly S05-0032 SWICS Limit Violation SSCPAM5V had 1 brief red high limit violation (>-4.5V). Jim Raines notified. 2005-233 15:11:36 - 15:12:00z -4.373 - -4.451V IMPACT: Awaiting instructions from Jim Raines. DOY 235 (08/23/05) ACE Anomaly S05-0033 S3DPU Limit Violations S3DPU_CONV_SEC_I had 3 brief red high limit violation (>440mA) during increased solar activity. SSDIDLECTR was 35-42 in all instances. Mark Popecki notified. 2005-235 15:37:01 - 15:37:03z 466 - 490mA 2005-235 15:37:14 - 15:37:15z 447 - 458mA 2005-236 06:37:05 - 06:37:21z 458 - 458mA IMPACT: S3DPU is expected to use more current during increased activity. DOY 236 (08/24/05) ACE Anomaly S05-0034 SWICS Limit Violations Several brief limit violations occurred during the recent increased solar activity. Jim Raines notified. SSCPAP5V 2005-236 06:48:38 - 06:49:02z 4.16-4.21V (YL <= 4.25V) SSCPAP5V 2005-236 07:24:40 - 07:25:04z 4.16-4.21V (YL <= 4.25V) SSCPAP5V 2005-236 07:36:41 - 07:37:05z 4.11-4.21V (YL <= 4.25V) SSCPAP5V 2005-236 07:48:41 - 07:48:05z 4.16-4.21V (YL <= 4.25V) SSCPAP5V 2005-236 08:00:30 - 08:01:06z 4.16-4.21V (YL <= 4.25V) SSCPAP5V 2005-236 10:59:52 - 11:00:28z 4.11V (YL <= 4.25V) SSCGR20V 2005-236 11:00:04 - 11:00:28z 16V (RL <= 16V) SSCGR20V 2005-236 16:00:32 - 16:00:56z 17V (YL <= 17V) SSCGR20V 2005-236 16:36:22 - 16:36:46z 17V (YL <= 17V) SSCPAM5V 2005-236 16:36:22 - 16:36:46z -4.37 - -4.45V (RH > -4.5V) IMPACT: Awaiting instructions from Jim Raines.