ACE Weekly 12/09/05 - 12/15/05 All ACE spacecraft subsystems are performing nominally. ============================================================================ Orbit/Attitude: Type Attitude Date 12/14/05 DOY 348 2005 Thrusters 2R 4R+ 4R- Duration 10:33 min Start Time 17:21:15z Stop Time 17:31:48z Start HGA 5.58 deg Stop HGA 6.37 deg Firing 54 pulses The next attitude and station-keeping maneuvers are scheduled for Thursday 12/22/05. ============================================================================ OCRs: DOY 349 (12/15/05) 1631-1630z SIS-035 Recent stepping up of bias voltage on HV side of Matrix detector M1B has been promising, resulting in overall improvement of noise on the detector strips. By turning off 2 more noisy strips and raising the M12B bias voltage by one notch, from 3.26V to 3.73V, we will further explore the effects of slightly higher bias voltage on the leakage current and the counting rates of this detector. If the results are positive we will leave the higher bias voltage in place. ============================================================================ Ongoing Activities: Space Link Extension (SLE) - The first version of ACE SLE was delivered to the Library on December 14. The delivery to the ACE MOC will not be until January. RIONet - String 3 is anticipated to move to the RIONet in January. The firewall in the TDF has not been completely configured and tested. The SA's would like the TDF configured with the firewall and RIONET before converting the MOC to the RIONET. ============================================================================ Extra Activities: DOY 346 (12/12/05) - A Project Interface Test (PIT) was done to validate the new ranging equipment with DSS-27. Post PIT analysis is still ongoing and a summary will be sent out by COB Monday. We are still waiting to hear from Flight Dynamics on the validity of the range data. ============================================================================ Anomalies: DOY 348 (12/14/05) G05-0151 MOPSS unable to process command sheet MOPSS was unable to export the maneuver command procedure. After several unsuccessful attempts to export, the maneuver command sheet was transfered to String 2 for MOPSS processing. IMPACTS: Delay in the start time for the maneuver due to MOPSS failure on primary operational string. Implemented a temporary workaround using the backup string for processing of the maneuver command sheet.