ACE Weekly 03/03/06 - 03/09/06 All ACE spacecraft subsystems are performing nominally. ============================================================================ Orbit/Attitude: No attitude maneuvers were completed this week. The next attitude maneuver is scheduled for Friday 03/10/06. ============================================================================ OCRs: None ============================================================================ Ongoing Activities: Space Link Extension (SLE) - The first version of ACE SLE was delivered to the Library on December 14. The delivery to the ACE MOC will not be until after String 3 is converted to the RIONET. RIONet - String 3 conversion to the RIONet is on hold based on NASCOM's schedule. Attitude Training - The FOT continues training on attitude determination, maneuver planning, and maneuver execution. ============================================================================ Extra Activities: None ============================================================================ Anomalies: DOY 066 (03/07/06) G06-0031 DSS-27 - Loss of Telemetry Telemetry dropped out for the last 26 minutes of the pass for unknown reasons. DR G106583 IMPACT: All data was captured from the SSR's. End of track state-of-health check was not performed. DOY 066 (03/07/06) G06-0032 TAPS CSV Files The FOT discovered that TAPS can only process a maximum of 100 CSV files during each request. Each CSV file contains a maximum of 30 days of data. When the TAPS request was made to obtain the data from the beginning of the mission to the current day TAPS could only process the first 100 CSV files which is roughly 3,000 days. DR CDSID 21540 IMPACT: Since the ACE mission is already longer than 3000 days, the FOT cannot plot data for life of mission unless multiple TAPS requests are made.