ACE Weekly 07/28/06 - 08/03/06 All ACE spacecraft subsystems are performing nominally. ============================================================================ Orbit/Attitude: Type Attitude Date 07/28/2006 DOY 209 2006 Thrusters 2R 4R- 4R+ Duration 9:52 min Start 15:17:28z Stop 15:27:20z StartHGA -3.07 deg StopHGA 6.52 deg Firing 50 pulses FinalSCMass 1396.318lbs The next attitude maneuver is scheduled for Friday, 08/04/06. ============================================================================ OCRs: None ============================================================================ Ongoing Activities: Attitude Training - The FOT continues training on attitude determination, maneuver planning, and maneuver execution. The transition date is tentatively scheduled for 08/11/06. RIONET - The transition to the RIONET on String 3 will tentatively occur around mid-September. Space Link Extension (SLE) - ACE SLE version 2.1 was delivered to the Library on April 28, 2006. The delivery to the ACE MOC will not occur until after the MOC is converted to the RIONET. Multi-Mission MOC - The FOT has begun supporting the effort to determine the feasibility of transferring to a multi-mission MOC. Automation - Development for the next ROBOTT automation release has begun on String 3. ============================================================================ Extra Activities: DOY 212 (07/31/06) - The FOT supported the first SPS Project Interface Test (PIT) with DSS-27. ============================================================================ Anomalies: DOY 209 (07/28/06) G06-0073 - AC3WS2 Dead AC3WS2 died. The power supply was replaced on DOY 209 but that did not solve the problem. On DOY 213 it was discovered that the cable between the computer and monitor was loose. IMPACT: No impact to operations. DOY 212 (07/31/06) G06-0074 - ACETLANPC CD-RW Drive Malfunctioning During the weekly history archive to the CD, the ACETLANPC CD Drive began to make strange noises. Hardware Maintenance looked at the drive, but didn't have a replacement at this time. IMPACT: The CD was created successfully, and the drive is currently not making the noise anymore. FOT will continue to monitor.