ACE Weekly 12/22/2006 - 12/28/2006 All ACE spacecraft subsystems are performing nominally. ============================================================================ Orbit/Attitude: Type Attitude Date 12/28/2006 DOY 362 2006 Thrusters 2R 4R- 4R+ Duration 7:51 min Start 16:11:34z Stop 16:19:25z StartHGA -2.90 deg StopHGA 5.62 deg Firing 40 pulses FinalSCMass 1393.687lbs The next attitude maneuver is scheduled for Thursday, 01/04/2007. ============================================================================ OCRs: OCR SEP-110 is scheduled to start on Wednesday 01/03/2007 (DOY 003) in conjunction with the attitude maneuver scheduled for Thursday 01/04/2006 (DOY 004). Sepica will be power-cycled to try to induce a gas valve to open. ============================================================================ Activities: The solar panel output was not impacted by the recent X-class solar flares. In the past (7/16/2000, 11/6/2001 and 10/29/2003) solar storms had caused a ~2% drop in solar panel performance. Current solar panel performance is 87% of beginning of mission output. RIONET - Testing and configuration of String 3 continues. * Commanding was tested on Thursday 12/28/2006 (DOY 362) but commands from String 3/RIONet were not reaching JPL's Special Function Gateway (SFG). Investigation continues. * FDF is reworking their process so that ACE ephemeris files are available to the RIONet. This is expected to be completed by 01/03/2007. * DSN CDR delivery to String 3 has not yet been configured for the RIONet IP address. * Completion of testing and configuration of String 3 is targeted 01/09/2007. * Tentative start date for converting String 2 to the Restricted IONet is 01/16/2007. Space Link Extension (SLE) - ACE SLE version 2.1 was delivered to the Library on April 28, 2006. Installation in the ACE MOC will not occur until after the MOC is converted to the RIONET. ============================================================================ Anomalies: DOY 355 (12/21/2006) S-ACE-0136 (G06-0123) - ACETLANPC failure. The acetlanpc froze again. This PC performs processing of DSN's 0158 monitor data and backup archiving of critical data. Hardware Maintenance replaced the PC power supply again. (The PC last froze on DOY 347 (12/13/2006) and Hardware Maintenance replaced the PC power supply for the first time.) IMPACT: DSN's 0158 monitor data not saved for DOY 355. Manual processing performed to maintain backup archiving of critical data. DOY 362 (12/28/2006) S-ACE-0137 (G06-0124) - ACETLANPC failure The acetlanpc froze again. Hardware maintenance notified. IMPACT: DSN's 0158 monitor data not saved for DOY 362. Manual processing performed to maintain backup archiving of critical data.