ACE Weekly 01/12/2007 - 01/18/2007 All ACE spacecraft subsystems are performing nominally. ============================================================================ Orbit/Attitude: Type Attitude Date 01/12/2007 DOY 012 2007 Thrusters 2R 4R- 4R+ Duration 10:36 min Start 16:27:23z Stop 16:37:59z StartHGA -4.89 deg StopHGA 5.72 deg Firing 54 pulses FinalSCMass 1393.361lbs The next attitude maneuver is scheduled for Friday, 01/19/2007. ============================================================================ OCRs: DOY 016 (01/16/2007) GND-178 Automated operations (ROBOTT) is now configured to use the DSN schedule provided by the SPS server. DOY 012 (01/12/2007) 1801-1807z SIS-040 M1B GND strip # 32 was disabled and its threshold raised due to saturated leakage current that caused oscillations in SIS RTSW data. Step 7 of OCR SEP-110 to turn off internal stimulation still needs to be scheduled. ============================================================================ Activities: DOY 012 (01/12/2007) - SSR B Telemetry Sections downlinked. Single Bit Error Count (SBE_CT_B) increased from 2118 to 3125 since last checked on 12/07/2006 (Reference AR S07-0001). No non-correctable errors (Hard Single Bit Errors & Double Bit Errors) have occurred throughout the mission. SSR A Telemetry Sections will be downlinked on Friday 01/19/2007. RIONET - Testing and configuration of String 3 continues. * FDF has updated their process for loading ephemeris files on the product server for access to the RIONet. Work continues for putting the 28-day NOAA ephemeris and maneuver command sheets on the product server. * DSN has updated their destination address for CDR delivery to String 3, but problems are still occurring. DSN is troubleshooting the problem as time is available. * The ROBOTT developer has started working on the patches to allow ROBOTT to work with the RIONet. Space Link Extension (SLE) - ACE SLE version 2.1 was delivered to the Library on April 28, 2006. Installation in the ACE MOC will not occur until after the MOC is converted to the RIONET. ============================================================================ Anomalies: DOY 012 (01/12/2007) S-ACE-0147 (G07-0009) - Continue Before CMD Verified Due to the timing of command verification, the procedure S_TLM_SECTIONS proceeded to build the next command before the previous command was verified. FOT intervention was required to step back in the procedure. MOCR 1284 has been submitted to add additional wait statements for command verification along with the wait for the telemetry update. S_TLM_SECTIONS is used for downlinking additional SSR housekeeping data (e.g. Single Bit Error Count). IMPACT: Procedure required intervention to complete. DOY 012 (01/12/2007) S-ACE-0148 (S07-0001) - Increase in SBE_CT_B SSR B Single Bit Error Count (SBE_CT_B) increased from 2118 to 3125 since last checked on DOY 341 (12/07/2006). Single Bit Errors are automatically corrected by the SSR. This increase is very likely due to the solar flares that had started on DOY 339 (12/05/2006). The following table gives a history of the Single Bit Error count for SSR A and SSR B. IMPACT: Minimal. Single Bit Errors are automatically corrected by the SSR and occur infrequently. SBE_CT_A SBE_CT_B 12/01/1999 15 09/06/2003 286 02/25/2003 30 09/22/2004 608 06/05/2003 270 11/15/2004 858 11/07/2006 2118 01/12/2007 3125 DOY 017 (01/17/2007) S-ACE-0149 (G07-0010) - AC2TAPS2 Frozen ac2taps2 froze on Wednesday 01/17/2007 around 1700z. The linux workstation was rebooted but generated errors. SysAdmins notified and the workstation was restored on 01/18/2007. The 2 TAPS workstations store all mission data for analysis and trending. IMPACT: Minimal. ac1taps1 was operating with no problems. Mission data copied from ac1taps1 to ac2taps2 after ac2taps2 was restored.