ACE Weekly 08/10/2007 - 08/16/2007 All ACE spacecraft subsystems are performing nominally. ============================================================================ Orbit/Attitude: Type Attitude Date 08/13/2007 DOY 225 2007 Thrusters 2R 4R+ 4R- Duration 12:23 min Start 15:52:01z Stop 16:04:24z StartHGA -6.44 deg StopHGA +7.54 deg Firing 63 pulses FuelUsed 0.2079lbs FuelRemain 155.0728lbs FinalSCMass 1389.333lbs The next attitude maneuver is scheduled for Friday, 08/24/2007. ============================================================================ OCRs: None ============================================================================ Activities: Space Link Extension (SLE) - The SLE/CMD software (v2.1) will be installed Tuesday 08/21/2007. A test with DTF-21 (DSN Test Facility) will be performed Wednesday 08/22/2007 at 1800z. Planning continues for integrating ACE operations into a multi-mission ops center (MMOC). The current TPOCC mission software will be replaced by ITOS and the ROBOTT automation software will be replaced by GMSEC tools (CAT, GREAT, ANSR, etc). The ADS attitude software will be replaced by MSASS/MTASS. The timeline for when this will occur has not yet been determined. ============================================================================ Anomalies: DOY 225 08/13/2007 S-ACE-0217 G07-0071 DSS-27 Antenna Pointing DSS-27 was unable to start tracking at Beginning Of Track (BOT) due to problems with the Antenna Monitor and Control (AMC) (DR#G107956). DSN personnel needed to travel to the antenna to reset it. IMPACT: Activities delayed 41 minutes. SSR playback and SWEPAM calibration were completed on the following pass (Tuesday 08/14/2007). DOY 225 08/13/2007 S-ACE-0218 G07-0072 Conflicting Schedule While DSS-27 had Antenna Pointing problems, the FOT requested DSS-66 be brought up for support if DSS-27 was unable to fix the problem. DSS-27 fixed the problem before DSS-66 was available and the pass was kept with DSS-27. However, the DSN schedule was updated for both DSS-27 and DSS-66. The ROBOTT automation software downloaded the new schedule and terminated the MOC software according to the DSS-66 pass times. IMPACT: The MOC software did not see the last 5 minutes of SSR data. That data was captured on the following pass.