ACE Weekly 11/21/2007 - 11/27/2007 All ACE spacecraft subsystems are performing nominally. ============================================================================ Orbit/Attitude: Type Attitude Date 11/27/2007 DOY 331 2007 Thrusters 2R 4R+ 4R- Duration 9:58 min Start 13:48:15z Stop 13:58:13z HGAStart -6.87deg HGAStop +7.34deg SunStart 14.47deg SunStop 4.86deg Nutation 0.23deg Firing 51 pulses FuelUsed 0.1713lbs FuelRemain 153.3892lbs FinalSCMass 1387.649lbs The next attitude maneuver is scheduled for Friday, 12/07/2007. ============================================================================ OCRs: None ============================================================================ Activities: ACE will start using F-CLTU SLE for operations on Friday 11/30/2007. The first pass is with DSS-66. 34m HEF S-Band Transmitter Testing Status DSS-65 tests have been scheduled as follows Date DOY Station Test Thu 11/29 333 DSS-65 Network SLE test Mon 12/03 337 DSS-65 S-Band XMTR, SLE and range data Wed 12/05 339 DSS-65 S-Band XMTR, SLE and range data ============================================================================ Anomalies: None