ACE Weekly 09/23/2009 - 09/29/2009 All ACE spacecraft subsystems are performing nominally. ======================================================================== Orbit/Attitude: Type Attitude SK-52 Date 09/24/2009 09/24/2009 DOY 267 2009 267 2009 Thrusters 2R 4R+ 4R- 3A 4A Duration 14:35 min 53.382 sec Start 13:41:07z 15:45:21z Stop 13:55:42z 15:46:14z HGAStart -5.56deg +7.90deg HGAStop +7.90deg +8.01deg SunStart 9.45deg 7.56deg SunStop 7.56deg 7.52deg SpinStart 5.0342rpm 5.0378rpm SpinStop 5.0378rpm 5.0254rpm Nutation 0.11deg 0.06deg Firing 74 pulses Continuous FuelUsed 0.2340lbs 0.1892lbs FuelRemain 140.7456lbs 140.5564lbs FinalSCMass 1375.006lbs 1374.817lbs Tracking/range data after SK-52 is more limited than in the past. For 7 days after the maneuver, there is only 1 ranging pass per day and no southern hemisphere ranging. The next attitude maneuver is scheduled for Friday 10/16/2009. ======================================================================= OCRs: DOY 265 (09/22/2009) GND-199 Replace McAfee VirusScan with Symantec McAfee VirusScan was removed from the Windows PCs in the MOC due to license expiration. Symantec AntiVirus was installed on Windows PCs on 09/22/2009. Symantec is available for Linux and is scheduled for install on 09/30/2009. ======================================================================== Activities: Data Capture: 100% DOY 263-270 2009 DSN availability will improve in the coming week. DSS-24 will be available starting on 09/28/2009 although painting will continue during the antenna's daylight hours until 10/6/2009. DSS-54 will be available starting on 10/1/2009 although ACQ AID INSTALL will continue during the antenna's daylight hours until 10/4/2009. LCROSS lunar impact is scheduled for 10/9/2009. Data capture for the past month has been surprisingly good given the limited DSN availability. There were only 3 gaps in the playback data (31 seconds, 31 seconds and 24 seconds). Similar limited DSN availability can result in hours of data loss (6 minutes of DSN time = 1 hour of playback data). ======================================================================== Anomalies: DOY 266 09/23/2009 S-ACE-0461 G09-0052 MOC Automation PostPass The MOC automation software (ROBOTT) did not start post pass cleanup after the pass on DOY 266. The reasons are not known. Impact: Minimal. The system is designed to not have problems when this occurs. There are several known scenarios where ROBOTT does not run postpass cleanup activities. This day, however, did not fit any of those scenarios.