ACE Weekly 03/10/2010 - 03/16/2010 All ACE spacecraft subsystems are performing nominally. ======================================================================== Orbit/Attitude: Type Attitude Date 03/10/2010 DOY 069 2010 Thrusters 2R 4R+ 4R- Duration 14:45 min Start 13:50:52z Stop 14:05:37z HGAStart -6.51deg HGAStop 7.55deg SunStart 9.43deg SunStop 8.29deg SpinStart 5.0486rpm SpinStop 5.0521rpm Nutation 0.22deg Firing 75 pulses FuelUsed 0.2363lbs FuelRemain 137.4924lbs FinalSCMass 1371.753lbs The next attitude maneuver is scheduled for Wednesday 03/31/2010. ======================================================================= OCRs: None ======================================================================== Activities: Data Capture: 100% DOY 066-073 2010 Multi-Mission Operations Center (MMOC) Summary The third week of ACE operational testing has been completed. * The 03/10/2010 attitude maneuver was executed from the MMOC. * WIND started operational testing in the MMOC on Thursday 03/11/2010. * Both ACE and WIND passes are being executed from a single computer. * Passes continue to be staffed in case of unexpected problems. ======================================================================== Anomalies: DOY 069 03/10/2010 S-ACE-0492 G10-0015 Limits Change Disables Limits When disabling the Red High Limit with the ITOS directive "LIMITS CHANGE", the entire limit is disabled. This only affects 2 mnemonics ULEIS_LVPS_I and PH_ANGL_LST. DR CDSID#00027501 has been submitted. IMPACT: Minimal. Limits are double checked with TAPS trending software.