ACE Weekly 11/09/2010 - 11/15/2010 All ACE spacecraft subsystems are performing nominally. ======================================================================== Orbit/Attitude: Type Attitude Date 11/10/2010 DOY 314 2010 Thrusters 2R 4R+ 4R- Duration 8:47 min Start 15:11:37z Stop 15:20:24z HGAStart -5.18deg HGAStop 7.74deg SunStart 9.98deg SunStop 5.25deg SpinStart 5.0632rpm SpinStop 5.0646rpm Nutation 0.05deg Firing 45 pulses FuelUsed 0.1480lbs FuelRemain 132.9704lbs FinalSCMass 1367.230lbs The next attitude maneuver is scheduled for Wednesday 11/17/2010. ======================================================================= OCRs: None ======================================================================== Activities: Data Capture: 100% DOY 313-319 2010 ======================================================================== Anomalies: DOY 313 11/09/2010 S-ACE-0555 G10-0071 ITOS tm_controller ITOS was unable to process telemetry due to a "timeout reading from tm_controller". ITOS was restarted before beginning of track. (DR CDSID#00027515) IMPACT: Manual intervention required. No delay in activities. ============================================================== Jacqueline Maldonado Snell Advanced Composition Explorer Flight Operations Team Manager Honeywell Technology Solutions Incorporated (HTSI) Goddard Space Flight Center Bldg. 14 Rm W10B, Mailstop 428.2 Greenbelt, MD 20771 Phone: (301) 286-7072 Fax: (301) 286-1729 E-mail: Jacqueline.M.Snell@nasa.gov ------=_NextPart_000_0058_01CB859B.EE1B1B10 Content-Type: text/html; charset="us-ascii" Content-Transfer-Encoding: quoted-printable

ACE = Weekly 11/09/2010-11/15/2010

 

 

All = ACE spacecraft subsystems are performing nominally.

 

=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D

Orbit/Attitude:

 

Type       = Attitude      

Date       = 11/10/2010    

DOY       &= nbsp; 314 2010      

Thrusters   2R = 4R+ 4R-    

Duration    8:47 = min      

Start       = 15:11:37z     

Stop       = 15:20:24z     

HGAStart    = -5.18deg           = ;   

HGAStop      = 7.74deg           =   

SunStart     = 9.98deg      

SunStop      = 5.25deg      

SpinStart   = 5.0632rpm     

SpinStop    = 5.0646rpm     

Nutation     = 0.05deg      

Firing      45 = pulses     

FuelUsed      = 0.1480lbs   

FuelRemain  = 132.9704lbs   

FinalSCMass 1367.230lbs    =

 

The next attitude maneuver is scheduled for = Wednesday 11/17/2010.

 

=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D

OCRs:

 

None

 

=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D

Activities:

 

Data = Capture:  100%  DOY 313-319 2010

 

=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D

Anomalies:

 

DOY = 313  11/09/2010  S-ACE-0555  G10-0071  ITOS = tm_controller

ITOS was unable to = process telemetry due to a "timeout reading from

tm_controller".  ITOS was restarted = before beginning of track.  (DR

CDSID#00027515)

IMPACT:  Manual intervention required.  = No delay in activities.

 

=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D

Jacqueline Maldonado = Snell

Advanced Composition = Explorer Flight Operations Team Manager

Honeywell Technology = Solutions Incorporated (HTSI)

Goddard Space Flight = Center

Bldg. 14 Rm W10B, = Mailstop 428.2

Greenbelt, MD = 20771

Phone: (301) 286-7072 =

Fax: (301) 286-1729 =

E-mail: Jacqueline.M.Snell@nasa.gov

 

------=_NextPart_000_0058_01CB859B.EE1B1B10--