ACE Weekly 11/30/2010 - 12/06/2010 All ACE spacecraft subsystems are performing nominally. ======================================================================== Orbit/Attitude: Type Attitude Date 12/03/2010 DOY 337 2010 Thrusters 2R 4R+ 4R- Duration 16:27 min Start 21:22:21z Stop 21:38:48z HGAStart -7.44deg HGAStop +7.50deg SunStart 7.00deg SunStop 10.78deg SpinStart 5.0733rpm SpinStop 5.0779rpm Nutation 0.18deg Firing 84 pulses FuelUsed 0.2610lbs FuelRemain 132.2568lbs FinalSCMass 1366.517lbs Due to staffing, Station Keeping #56 was postponed to Monday 12/13/2010 which is also the next attitude maneuver. ======================================================================= OCRs: DOY 340 (12/06/2010) MMOC-232 TAPS Trending Computers Moved to MMOC The TAPS Trending Computers were moved to the MMOC (TAPS2 on 11/22/2010 and TAPS1 on 12/06/2010). The computers will not be connected to the network due to IT Security (old operating system & old java). The software was not able to run on newer systems (in particular java). Telemetry data will be ingested via Compact Discs. ======================================================================== Activities: Data Capture: 100% DOY 332-339 2010 Operations continues on the backup ground system. DSN has updated their schedule for DCD deployment. All ACE passes starting on Friday 12/10/2010 (DOY 344) are expected to be using DSN's new DCD (Data Capture and Delivery) system. On Monday 11/29/2010, files were successfully transferred from DSN's DCD system to the MMOC. There is a higher than normal risk of data loss from October 2010 through February 2011. If there are problems with the passes, it may not be possible to acquire additional DSN time. ======================================================================== Anomalies: DOY 335 12/01/2010 S-ACE-0562 G10-0077 DSN Network Problems At 1656z, Goldstone DSCC LAN switch failed. No data and voice connections were reaching JPL, and therefore the MMOC for the remainder of the pass. DR#G110816 IMPACT: No telemetry to the MMOC or DSN's CDR from 1656z to 1855z (End Of Track). No real-time data to NOAA Space Weather Prediction Center for 2 hours. Science data captured on the following support. DOY 339 12/05/2010 S-ACE-0563 G10-0078 ITOS tm_controller Before Beginning Of Track, ITOS had problems connecting telemetry, "timeout reading from tm_controller". ITOS was stopped and restarted. IMPACT: Manual intervention required. Activities delayed 40 minutes.