ACE Weekly 01/11/2011 - 01/17/2011 All ACE spacecraft subsystems are performing nominally. ======================================================================== Orbit/Attitude: No maneuvers were completed this week. The next attitude maneuver is scheduled for Friday, 01/21/2011. ======================================================================= OCRs: None ======================================================================== Activities: Data Capture: 100% DOY 010-017 2011 There is a higher than normal risk of data loss from October 2010 through February 2011. If there are problems with the passes, it may not be possible to acquire additional DSN time. Nominally there is one IDR file per channel (realtime and playback) per ACE support available for download on the DCD. However, since DOY 013 ACE's data has been split into ~7 IDR files per channel per support. ASC notified the ACE NOPE and S. Kurtik of this discrepancy. ======================================================================== Anomalies: DOY 011 01/11/2011 S-ACE-0577 G11-0005 ITOS tm_controller ITOS was unable to process telemetry due to a "timeout reading from tm_controller". ITOS was restarted before beginning of track. (DR CDSID#00027515) IMPACT: Manual intervention required. No delay in activities. DOY 013 01/13/2011 S-ACE-0578 G11-0006 Empty Clock Calibration Reports generated Invalid Clock Calibration Reports generated during automated post-pass activities. IMPACT: FOT manually re-generated 013, 014 and 015 Clock Calibration Reports. ITOS restarted on DOY 016 and no further problems with automated clock calibration report generation. ============================================================== Jacqueline Maldonado Snell Advanced Composition Explorer Flight Operations Team Manager Honeywell Technology Solutions Incorporated (HTSI) Goddard Space Flight Center Bldg. 14 Rm W10B, Mailstop 428.2 Greenbelt, MD 20771 Phone: (301) 286-7072 Fax: (301) 286-1729 E-mail: Jacqueline.M.Snell@nasa.gov ------=_NextPart_000_000C_01CBB713.5BA961C0 Content-Type: text/html; charset="us-ascii" Content-Transfer-Encoding: quoted-printable

ACE = Weekly 01/11/2011 - 01/17/2011

 

All = ACE spacecraft subsystems are performing nominally.

 

=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D

Orbit/Attitude:

 

No = maneuvers were completed this week. 

The next attitude maneuver is scheduled for Friday, = 01/21/2011.

 

=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D

OCRs:

 

None

 

=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D

Activities:

 

Data = Capture:  100%  DOY 010-017 2011

 

There = is a higher than normal risk of data loss from October = 2010

through February 2011.  = If there are problems with the passes, it may

not be possible to acquire additional DSN = time.

 

Nominally there is one IDR file per channel = (realtime and playback)

per ACE = support available for download on the DCD.  However, since =

DOY 013 ACE’s data has been = split into ~7 IDR files per channel per

support.  ASC notified the ACE NOPE and S. = Kurtik of this discrepancy.

 

=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D

Anomalies:

 

DOY = 011  01/11/2011  S-ACE-0577  G11-0005  ITOS = tm_controller

ITOS was unable to = process telemetry due to a "timeout reading from

tm_controller".  ITOS was restarted = before beginning of track.  (DR

CDSID#00027515)

IMPACT:  Manual intervention required.  = No delay in activities.

 

DOY = 013  01/13/2011  S-ACE-0578  G11-0006  Empty Clock = Calibration Reports generated

Invalid Clock Calibration Reports generated during = automated post-pass activities.

IMPACT:  FOT manually re-generated 013, 014 = and 015 Clock Calibration Reports.  ITOS

restarted on DOY 016 and no further problems with = automated clock calibration report generation. 

 

=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D

Jacqueline Maldonado = Snell

Advanced Composition = Explorer Flight Operations Team Manager

Honeywell Technology = Solutions Incorporated (HTSI)

Goddard Space Flight = Center

Bldg. 14 Rm W10B, = Mailstop 428.2

Greenbelt, MD = 20771

Phone: (301) 286-7072 =

Fax: (301) 286-1729 =

E-mail: Jacqueline.M.Snell@nasa.gov

 

 

------=_NextPart_000_000C_01CBB713.5BA961C0--