ACE Weekly 03/01/2011 - 03/07/2011 All ACE spacecraft subsystems are performing nominally. ======================================================================== Orbit/Attitude: No maneuvers were completed this week. The next attitude maneuver is scheduled for Thursday 03/17/2011. ======================================================================= OCRs: None ======================================================================== Activities: Data Capture: 100% DOY 058-065 2011 ======================================================================== Anomalies: WIND anomalies reported when they would affect ACE. DOY 060 03/01/2011 S-WIND-0413 ITOS tm_controller Before Beginning Of Track, ITOS had problems connecting telemetry, "timeout reading from tm_controller". ITOS was not restarted before the end of the WIND pass. CDSID#00027515 IMPACT: WIND automatic playback captured by DSN. ITOS restarted before the ACE pass. DOY 061 03/02/2011 S-WIND-0413 ITOS tm_controller Before Beginning Of Track, ITOS had problems connecting telemetry, "timeout reading from tm_controller". ITOS was stopped and restarted and the WIND pass was taken successfully. CDSID#00027515 IMPACT: Manual intervention required.