ACE Weekly 10/04/2011 - 10/10/2011 All ACE spacecraft subsystems are performing as expected. ======================================================================== Orbit/Attitude: Type Attitude Date 10/07/2011 DOY 280 2011 Thrusters 2R 4R+ 4R- Duration 15:14 min Start 16:15:15z Stop 16:30:29z HGAStart -7.46deg HGAStop +7.70deg SunStart 17.92deg SunStop 5.59deg SpinStart 5.0183rpm SpinStop 5.0224rpm Nutation 0.19deg Firing 77 pulses FuelUsed 0.2433lbs FuelRemain 126.5388lbs FinalSCMass 1360.799lbs The next attitude maneuver is scheduled for Friday 10/21/2011. ======================================================================= OCRs: DOY 283 (10/10/2011) 1617-1631z SWICS MOCR 338 Energy Pulser turned off and MCPPS voltages turned up to its operational value (2.6kV). The SWICS instrument continues to be in an ESA-energy trigger mode. This bypasses the TOF system and the hybrid timing discriminator electronics that is believed to be the cause of the trigger problem. SWICS is collecting partial science data and the instrument team is investigating the optimum configuration for the instrument. MCPPS=Multi-Channel Plate Power Supply, ESA=ElectroStatic Analyzer, TOF=Time-Of-Flight ======================================================================== Activities: Data Capture: 100% DOY 275-282 2011 NOAA Space Weather Prediction Center has set up a new server in Suitland, MD for receiving ACE telemetry. The MMOC started sending telemetry to both the Boulder, CO server and the Suitland, MD server starting Saturday 10/08/2011. The MMOC had been sending data to a test server at Suitland, MD from 08/31/2011 to 09/17/2011. The Authorization to Connect to the AFSCN has been approved. Data successfully flowed from AFSCN to GSFC MMOC to NOAA SWPC from 10/09/2011 (DOY 282) 2247z to 10/10/2011 (DOY 283) 0530z. GRAIL has reduced the amount of DSN antenna time they are using. The SSR procedures will be changed back so that the SSRs are recording during the pass. In December, GRAIL antenna usage is expected to increase again. ======================================================================== Anomalies: DOY 278 10/05/2011 S-ACE-0629 G11-0055 Range Calibration Problems The ground station had troubles performing pre-pass range calibration. DRs G112018 & G112020. IMPACT: Activities delayed 25 minutes. This put the SSR playback further behind schedule. But all playback data was eventually caught up on Sunday 10/09/2011. DOY 281 10/08/2011 S-ACE-0506 S10-0004 S3DPU_CONV_SEC_I RH Limit S3DPU_CONV_SEC_I had a brief red high limit violation (RH > 480 mV). 2011-281 14:21:51 - 14:21:52 486.328-505.938 mV Mark Popecki was notified. IMPACT: The last brief S3DPU_CONV_SEC_I red high limit violation was DOY 139 2010.