ACE Weekly 12/13/2011 - 12/19/2011 All ACE spacecraft subsystems are performing as expected. ======================================================================== Orbit/Attitude: Type Attitude SK-59 Date 12/15/2011 12/15/2011 DOY 349 2011 349 2011 Thrusters 2R 4R+ 4R- 1A 2A Duration 16:10 min 41.574 sec Start 17:52:59z 19:11:05z Stop 18:09:09z 19:11:47z HGAStart -8.22deg +7.39deg HGAStop +7.39deg +7.38deg SunStart 6.57deg 17.59deg SunStop 17.59deg 17.40deg SpinStart 5.0456rpm 5.0504rpm SpinStop 5.0504rpm 5.0375rpm Nutation 0.16deg 0.39deg Firing 82 pulses Continuous FuelUsed 0.2565lbs 0.1460lbs FuelRemain 124.8644lbs 124.7180lbs FinalSCMass 1359.124lbs 1358.980lbs The next attitude maneuver is scheduled for Thursday 12/15/2011. ======================================================================= OCRs: None ======================================================================== Activities: Data Capture: 100% DOY 345-352 2011 The ACE passes in the upcoming week (12/20/2011 through 12/29/2011) average 2.6 hours per day. The GRAIL mission is performing their Lunar Orbit Insertion and their antenna view time is the same as ACE's. ACE is allocated 3.5 hours per day but can squeak by with 2.75 hours per day. The SSR playback will fall behind by ~10 hours over this period, but no data loss is expected. Data capture should be caught up during the long pass scheduled for 12/30/2011. ======================================================================== Anomalies: None