ACE Weekly 10/01/2014 - 10/07/2014 All ACE spacecraft subsystems are performing as expected. =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D Orbit/Attitude: Type Attitude Date 10/07/2014 DOY 280 2014 Thrusters 2R 4R+ 4R- Duration 10:16 min Start 15:43:29z Stop 15:53:45z ra,decStart 186.22,-18.33 ra,decStop 195.74,-21.10 ra,decExpect 196.39,-21.29 Deviation 0.64 deg (-6% short) HGAStart -9.74 deg HGAStop +10.64 deg SunStart 14.42 deg SunStop 15.80 deg SpinStart 4.9923 rpm SpinStop 4.9952 rpm Nutation 0.12 deg Firing 52 pulses FuelUsed 0.1630 lbm FuelRemain 103.5856 lbm FinalSCMass 1337.845 lbm The next attitude maneuver is scheduled for Tuesday 10/14/2014. =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D OCRs: None =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D Activities: Data Capture: 100% DOY 272-278 2014 =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D Anomalies: DOY 280 10/07/14 S-ACE-0690 DSN's Earth Receipt Time (ERT) DSN ERT was behind by one second for the entire D15 support on DOY 280. IMPACT: Data flagged bad and discarded. The Clock Calibration Report was = regenerated and delivered to ASC and NOAA. =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D Jacqueline Maldonado Snell WIND, Geotail and ACE Flight Operations Team Manager Honeywell Technology Solutions Incorporated (HTSI) Goddard Space Flight Center Bldg. 14 Rm N284, Mailstop 428.2 Greenbelt, MD 20771 Office: 301-286-7072 Cell: 443-896-8868 Fax: 301-286-8257 Email: Jacqueline.M.Snell@nasa.gov --_000_78235E3560DF5348866CB22962C81DE80E457EA9NDMSMBX402ndcna_ Content-Type: text/html; charset="us-ascii" Content-Transfer-Encoding: quoted-printable
ACE Weekly 10/01/2014 – 10/07/2014
All ACE spacecraft subsystems are performing as e=
xpected.
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D
Orbit/Attitude:
Type &nb=
sp;  =
; &n=
bsp; Attitude
Date &nb=
sp;  =
; &n=
bsp; 10/07/2014
DOY &nbs=
p; =
&nb=
sp; 280 2014
Thrusters &nb=
sp; =
2R 4R+ 4R-
Duration &nbs=
p; =
10:16 min
Start &n=
bsp; &nbs=
p; &=
nbsp; 15:43:29z
Stop &nb=
sp;  =
; &n=
bsp; 15:53:45z
ra,decStart &=
nbsp; &nbs=
p; 186.22,-18.33
ra,decStop &n=
bsp;  =
; 195.74,-21.10
ra,decExpect =
&nb=
sp; 196.39,-21.29
Deviation &nb=
sp; =
0.64 deg (-6% short)
HGAStart &nbs=
p; &=
nbsp; -9.74 deg
HGAStop  =
; &n=
bsp; +10.64 deg
SunStart &nbs=
p; &=
nbsp; 14.42 deg
SunStop  =
; &n=
bsp; 15.80 deg
SpinStart &nb=
sp; =
4.9923 rpm
SpinStop &nbs=
p; &=
nbsp; 4.9952 rpm
Nutation &nbs=
p; &=
nbsp; 0.12 deg
Firing =
&nb=
sp; =
52 pulses
FuelUsed &nbs=
p; &=
nbsp; 0.1630 lbm
FuelRemain &n=
bsp;  =
; 103.5856 lbm
FinalSCMass &=
nbsp; &nbs=
p; 1337.845 lbm
The next attitude maneuver is scheduled for Tuesd=
ay 10/14/2014.
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D
OCRs:
None
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D
Activities:
Data Capture: 100% DOY 272-278 2014
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D
Anomalies:
DOY=
280 10/07/14 S-ACE-0690 DSN’s Earth Receipt Time (=
ERT)
DSN=
ERT was behind by one second for the entire D15 support on DOY 280.
IMP=
ACT: Data flagged bad and discarded. The Clock Calibration Repo=
rt was regenerated and delivered to ASC and NOAA.
=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
Jacqueline Maldonado=
Snell
WIND, Geotail and AC=
E Flight Operations Team Manager
Honeywell Technology=
Solutions Incorporated (HTSI)
Goddard Space Flight=
Center
Bldg. 14 Rm N284, Ma=
ilstop 428.2
Greenbelt, MD 20771<= o:p>
Office: 301-286-7072=
Cell: &nb=
sp; 443-896-8868
Fax: &nbs=
p; 301-286-8257
Email: Jacquel=
ine.M.Snell@nasa.gov