ACE Weekly 01/04/2017 - 01/10/2017 All ACE spacecraft subsystems are performing as expected. =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D Attitude/Orbit: Type Attitude SK-83 Date 1/11/2017 1/11/2017 DOY 011 2017 011 2017 Thrusters 2R 4R+ 4R- 3A 4A Duration 7:09 minutes 70 seconds Start 19:39:42z 21:05:06z Stop 19:46:51z 21:06:16z ra,decStart 274.39,-16.89 280.99,-18.15 ra,decStop 280.99,-18.15 281.00,-18.12 ra,decExpect 281.23,-18.26 280.99,-18.15 Deviation 0.24 deg (-3.7%) (+2.004%) HGAStart -8.28 deg -2.28 deg HGAStop -2.28 deg -2.33 deg SunStart 18.54 deg 12.23 deg SunStop 12.23 deg 12.28 deg SpinStart 4.9639 rpm 4.9656 rpm SpinStop 4.9656 rpm 4.9507 rpm Nutation 0.18 deg 0.15 deg Firing 36 pulses Continuous FuelUsed 0.1112 lbm 0.1999 lbm FuelRemain 86.243 lbm 86.0431 lbm FinalSCMass 1320.503 lbm 1320.303 lbm Upcoming Maneuver Schedule: - Attitude Maneuver: Tuesday, 11/17/2017 =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D OCRs: None =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D Activities: Data Capture: 100% DOY 002-008 2017 =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D Anomalies: 01/04/2017 DOY 004 S-ACE-93-CTT-9 DSN Problem D15 - Goldstone Complex BOT activities delayed due to D15 downlink problems. JPL reported "Late up= link and downlink activities due to problems getting a DCC configured." Tw= o different DCCs attempted before DCC06 successfully established connection= (DR# 117721). IMPACT: BOT delayed forty five minutes (1515-1600z). Pass activities resu= med automatically; all data successfully recovered during support. 01/06/2017 DOY 006 S-ACE-101 FOT account unable to download schedule from = SPS Automation unable to log in to SPS and download DSN schedules. FOT notifie= d NOPE as well as SSMO Lead Scheduler. JPL/DSN is aware of the issue with = FOT accounts and is working to resolve login issues. IMPACT: FOT manually updating automation's cron with all Wind/ACE DSN supp= orts until the automated download and update can be resumed. =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D Jacqueline Maldonado Snell Wind, Geotail and ACE Flight Operations Team Manager Goddard Space Flight Center, Bldg 14 Room N284, Mailstop 428.2 | Greenbel= t, MD 20771 | USA Office: +1 301.286.7072 | Mobile: +1 443.896.8868 | jacqueline.m.snell@= nasa.gov --_000_78235E3560DF5348866CB22962C81DE811712203NDMSMBX402ndcna_ Content-Type: text/html; charset="us-ascii" Content-Transfer-Encoding: quoted-printable
ACE Weekly 01/04/2017 – 01/10/2017
 
All ACE spacecraft subsystems are performing as expected.
 
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
 
Attitude/Orbit:
 
Type               Attitude   =                SK-83
Date              1/11/2017   =            1/11/2017
DOY                011 2017 &n= bsp;             011 2017
Thrusters        2R 4R+ 4R-     &nbs= p;            3A 4A
Duration       7:09 minutes        =     70 seconds
Start             19:39:42z    = ;          21:05:06z
Stop              19:46:51z   =            21:06:16z
ra,decStart   274.39,-16.89          280= .99,-18.15
ra,decStop    280.99,-18.15         &nbs= p;281.00,-18.12
ra,decExpect  281.23,-18.26          280= .99,-18.15
Deviation          0.24 deg (-3.7%)   &n= bsp;            (+2.004%) 
HGAStart          -8.28 deg     &nb= sp;        -2.28 deg
HGAStop           -2.28 deg     &nb= sp;        -2.33 deg
SunStart          18.54 deg     &nb= sp;        12.23 deg
SunStop           12.23 deg     &nb= sp;        12.28 deg
SpinStart        4.9639 rpm       &= nbsp;     4.9656 rpm
SpinStop         4.9656 rpm       &= nbsp;     4.9507 rpm
Nutation           0.18 deg     &nb= sp;         0.15 deg
Firing            36 pulses    = ;         Continuous
FuelUsed         0.1112 lbm       &= nbsp;     0.1999 lbm
FuelRemain       86.243 lbm        =    86.0431 lbm
FinalSCMass    1320.503 lbm         &nbs= p; 1320.303 lbm
 
Upcoming Maneuver Schedule:
- Attitude Maneuver:        &n= bsp;           Tuesday,&n= bsp;  11/17/2017
 
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
OCRs:
 
None
 
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
Activities:
 
Data Capture: 100%  DOY 002-008 2017
 
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
 
Anomalies:  
 
01/04/2017 DOY 004 S-ACE-93-CTT-9  DSN Problem D15 - Goldstone Co= mplex
BOT activities delayed due to D15 downlink problems.  JPL reporte= d “Late uplink and downlink activities due to problems getting a DCC = configured.”  Two different DCCs attempted before DCC06 successf= ully established connection (DR# 117721).
IMPACT:  BOT delayed forty five minutes (1515-1600z).  Pass = activities resumed automatically; all data successfully recovered during su= pport.
 
01/06/2017 DOY 006 S-ACE-101  FOT account unable to download sche= dule from SPS
Automation unable to log in to SPS and download DSN schedules.  F= OT notified NOPE as well as SSMO Lead Scheduler.  JPL/DSN is aware of = the issue with FOT accounts and is working to resolve login issues.  <= /div>
IMPACT:  FOT manually updating automation’s cron with all W= ind/ACE DSN supports until the automated download and update can be resumed= .
 
 
=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D= =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
 
Jacqueline Maldonado Snell
 
Wind, Geotail and ACE Flight Operations Team Manager
Goddard Space Flight Center, Bldg 14 Room N284, Mailstop 428.2&n= bsp; |  Greenbelt, MD 20771  |  USA
Office: +1 301.286.7072  |  Mobile: +1 443.896= .8868  |  jacqueline.m.snell@nasa.gov
 
 
 
 
--_000_78235E3560DF5348866CB22962C81DE811712203NDMSMBX402ndcna_--