ACE Weekly 04/05/2017 04/18/2017 All ACE spacecraft subsystems are performing as expected. ========================== ========================== ====================== Attitude/Orbit: Type Attitude Type Attitude Date 4/11/2017 Date 4/17/2017 DOY 101 2017 DOY 107 2017 Thrusters 2R 4R+ 4R- Thrusters 2R 4R+ 4R- Duration 12:19 minutes Duration 6:13 minutes Start 16:59:30z Start 11:33:59z Stop 17:11:49z Stop 11:40:12z ra,decStart 32.67,4.05 ra,decStart 37.42,14.32 ra,decStop 37.47,14.13 ra,decStop 43.01,14.67 ra,decExpect 37.91,14.37 ra,decExpect 43.31,14.55 Deviation 0.49 deg (-3.5%) Deviation 0.31 deg= (-5.0%) HGAStart +6.49 deg HGAStart +3.60 de= g HGAStop +8.48 deg HGAStop +8.84 de= g SunStart 13.34 deg SunStart 12.38 deg SunStop 18.00 deg SunStop 17.72 deg SpinStart 4.9667 rpm SpinStart 4.9701 rpm SpinStop 4.9702 rpm SpinStop 4.9717 rpm Nutation 0.07 deg Nutation 0.06 deg Firing 62 pulses Firing 31 pulses FuelUsed 0.1810 lbm FuelUsed 0.0972 lbm FuelRemain 83.768 lbm FuelRemain 83.671 lbm FinalSCMass 1318.029 lbm FinalSCMass 1317.932 lbm Upcoming Maneuver Schedule: - Attitude Maneuver: Tuesday, 04/25/2017 ========================== ========================== ====================== OCRs: Update: ACE-378 Authorization to command to ACE Spacecraft from virtual MM= OC (vMMOC) FOT continue to work with WS1/WFF Personnel to resolve on-going WS1 issues: Fanout connectivity, WS1 schedule delivery and System Status log access - WS1 test pass supported on 04/05/2017. All playback data recovered witho= ut incident; manual intervention not required. - NEN Engineer provided FOT with public key credentials. MMOC SAs will upd= ate nenso user configuration. Once completed, FOT will coordinate test delivery of N= EN schedule. ========================== ========================== ====================== Activities: Data Capture: 99.98% DOY 093-106 2017 ========================== ========================== ====================== Anomalies: 4/08/2017 DOY 098 S-ACE-93-CTT-12 DSN Problem D15 - Goldstone Complex There was a telemetry dropout during the carryover playback at the start of= the support. Station reported "Carrier dropped out of lock unexpectedly. Loss of 2 way D= oppler, telemetry and Ranging. Halt All and SYM RESET was performed on DC11 followe= d by an ACQ CAR and ACQ SYM. Carrier in lock at 17:34:14z, Telemetry in lock at 17:34:4= 3 and Ranging in lock at 17:36:02z"(DR# G118035). IMPACT: Unrecoverable data loss totaling 213 seconds (~3.55 minutes). 4/13/2017 DOY 103 S-ACE-35-CTT-4 DSN Problem D65 - Madrid Complex Ops Chief notified FOT @ 08:18z that D65 had a system trip and had to re-es= tablish the uplink. The station=92s SLE command system was waiting for the MMOC. DSN reported = that =93S250W Transmitter down due to 'Open interlock: Microwave interlock or Key Switch is Safe' ala= rm." Corrective action included "1W D/L signal acquired. Interlock cleared by ILR. Permission gran= ted by OPS Chief to perform a new uplink acquisition at(08:02:35). CMD E at 08:03:30. 2W D/L si= gnal reacquired at 08:03:34, TLM locked at 08:04:01 and RNG lock achieved 0:05:36. (DR# M10992= 1)=94. FOT notified the Ops Chief that the MMOC software would automatically reset the command = link prior to issuing its next command. IMPACT: Minimal. Uplink capability lost for about ~6 minutes. Affected S= SR data redumped; all data successfully recovered. --_000_78235E3560DF5348866CB22962C81DE823B9C52FNDMSMBX402ndcna_ Content-Type: text/html; charset="Windows-1252" Content-Transfer-Encoding: quoted-printable
ACE Weekly 04/05/2017 04/18/2017
 
All ACE spacecraft subsystems are performing as expected.
 
======================== ========================== ========================
 
Attitude/Orbit:
 
     Type       = ;        Attitude    = ;            Type&nb= sp;            =   Attitude          =              &n= bsp;            = ;   
     Date       = ;       4/11/2017    &nbs= p;           Date &n= bsp;            4/17= /2017            &nb= sp;            =       
     DOY       =          101 2017   =              DO= Y            &n= bsp;   107 2017        &n= bsp;            &nbs= p;            &= nbsp;
     Thrusters      =   2R 4R+ 4R-         =        Thrusters     = ;   2R 4R+ 4R-     
     Duration       = 12:19 minutes          &n= bsp;    Duration       6:13 mi= nutes           &nbs= p;             =
     Start      &nbs= p;      16:59:30z     &nb= sp;          Start  =            11:33:59z = ;            &n= bsp;            &nbs= p;      
     Stop       = ;       17:11:49z    &nbs= p;           Stop &n= bsp;            11:4= 0:12z
     ra,decStart      32.= 67,4.05           &n= bsp;    ra,decStart     37.42,14.32 = ;            &n= bsp;            &nbs= p;  
     ra,decStop      = ; 37.47,14.13          &n= bsp;    ra,decStop      43.01,14.67=              &n= bsp;           
     ra,decExpect     37.91,14= .37            =    ra,decExpect    43.31,14.55
     Deviation      =     0.49 deg (-3.5%)      &nbs= p; Deviation          0.31 deg= (-5.0%) 
     HGAStart      &= nbsp;   +6.49 deg       &n= bsp;        HGAStart   &n= bsp;       +3.60 deg   &nb= sp;            =
     HGAStop      &n= bsp;    +8.48 deg      &nb= sp;         HGAStop  &nbs= p;         +8.84 deg  = ;            &n= bsp;            &nbs= p;     
     SunStart      &= nbsp;   13.34 deg        =         SunStart    =       12.38 deg      = ;             &= nbsp;           &nbs= p; 
     SunStop      &n= bsp;    18.00 deg       &= nbsp;        SunStop   &n= bsp;       17.72 deg     =     
     SpinStart      =   4.9667 rpm         &nbs= p;      SpinStart     &nb= sp;  4.9701 rpm         &= nbsp;            &nb= sp;        
     SpinStop      &= nbsp;  4.9702 rpm         = ;       SpinStop     = ;    4.9717 rpm       &nb= sp;             = ;          
     Nutation      &= nbsp;    0.07 deg       &= nbsp;        Nutation   &= nbsp;       0.06 deg   
     Firing      &nb= sp;     62 pulses      &n= bsp;         Firing  &nbs= p;         31 pulses  &nb= sp;            =              &= nbsp;  
     FuelUsed      &= nbsp;  0.1810 lbm         = ;       FuelUsed     = ;    0.0972 lbm       &nb= sp;             = ;          
     FuelRemain      = ; 83.768 lbm          &nb= sp;     FuelRemain       = 83.671 lbm
     FinalSCMass    1318.029 lbm&nb= sp;            =    FinalSCMass    1317.932 lbm
 
 
Upcoming Maneuver Schedule:
- Attitude Maneuver:        &n= bsp;           Tuesday, 0= 4/25/2017
 
======================== ========================== ========================
OCRs:
 
Update:  ACE-378 Authorization to command to ACE Spacecraft from = virtual MMOC (vMMOC)
FOT continue to work with WS1/WFF Personnel to resolve on-going WS1 is= sues:
Fanout connectivity, WS1 schedule delivery and System Status log acces= s
- WS1 test pass supported on 04/05/2017.  All playback data recov= ered without incident;
manual intervention not required.
- NEN Engineer provided FOT with public key credentials.  MMOC SA= s will update nenso
user configuration.  Once completed, FOT will coordinate test del= ivery of NEN schedule.
 
======================== ========================== ========================
Activities:
 
Data Capture: 99.98%  DOY 093-106 2017
 
======================== ========================== ========================
 
Anomalies:  
 
4/08/2017  DOY 098 S-ACE-93-CTT-12      = DSN Problem D15 - Goldstone Complex
There was a telemetry dropout during the carryover playback at the sta= rt of the support. 
Station reported "Carrier dropped out of lock unexpectedly. Loss = of 2 way Doppler,
telemetry and Ranging. Halt All and SYM RESET was performed on DC11 fo= llowed by an ACQ
CAR and ACQ SYM. Carrier in lock at 17:34:14z, Telemetry in lock at 17= :34:43 and Ranging
in lock at 17:36:02z"(DR# G118035).
IMPACT:  Unrecoverable data loss totaling 213 seconds (~3.55 minu= tes).
 
4/13/2017  DOY 103 S-ACE-35-CTT-4     &n= bsp; DSN Problem D65 - Madrid Complex
Ops Chief notified FOT @ 08:18z that D65 had a system trip and had to = re-establish the uplink.
The station=92s SLE command system was waiting for the MMOC.  DSN= reported that =93S250W Transmitter
down due to 'Open interlock: Microwave interlock or Key Switch is Safe= ' alarm." Corrective action
included "1W D/L signal acquired. Interlock cleared by ILR. Permi= ssion granted by OPS Chief to
perform a new uplink acquisition at(08:02:35). CMD E at 08:03:30. 2W D= /L signal reacquired at
08:03:34, TLM locked at 08:04:01 and RNG lock achieved 0:05:36. (DR# M= 109921)=94.  FOT notified
the Ops Chief that the MMOC software would automatically reset the com= mand link prior to
issuing its next command.
IMPACT: Minimal.  Uplink capability lost for about ~6 minutes. = Affected SSR data redumped;
all data successfully recovered.
 
 
 