TELESCOPE AUTOMATION AND SAFETY 1) Finish shutter status signal. 2) Finish shutter open/close control. 3) Finish shutter-close operation by weather/solar signals. 4) Finish Dome-rotation-controller Reset hardware and software. 5) Finish disabling of manual controls during automated observing. 6) Implement watchdog software to monitor state of TCS tasks. 7) Finish telescope-initialize command to streamline beginning-of-night operations. 8) Finish flat-field lamp control by TCS. INSTRUMENT COMMUNICATIONS 1) Finish GXN interface for first-generation (CCD13/OSCAR) observing program. 2) Finish ArcView interface for next-generation observing program. MISCELLANEOUS FIXES 1) Improve telescope tracking/pointing. 2) Fix tracking glitch that sometimes occurs when dome position updates. 3) Improve efficiency of telescope and dome slewing (minimize overshoot). 4) Implement windscreen hardware/software. 5) Replace HA and dec axis encoders. 6) Implement weather system webpage.